Natural gasOperatingSOCO

Sewell Creek Energy

Natural gas power plant in Polk County, Georgia. 570 MW of nameplate capacity across 4 generators, operated by Oglethorpe Power Corporation.

Also known as Sewell Creek Energy Facility · EIA plant 7813

Analyst: free account, 1 question a day.

Polk CedartownPolk Cedartown 2RockmartInland Paperboard Packaging RomeBowenSewell Creek Energy20 km
Open in the map
6 plants within 38 km, from EIA coordinates.

Key facts

Capacity
570 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
June 2000First generator online
Operator
Oglethorpe Power CorporationEIA operator ID 13994
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Polk County, GA33.9486, −85.2769
EIA plant ID
7813EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sewell Creek Energy produces

Free · EIA-923

Net generation, 2025

416 GWh

415,682 MWh, final

Capacity factor, 2025

8.3%

2024: 10.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

267.3–592.6

GWh a year. Low 2015, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
2001123,389Not reported12 of 12
200252,519Not reported12 of 12
20035,168Not reported12 of 12
200417,090Not reported12 of 12
200564,998Not reported12 of 12
2006112,401Not reported12 of 12
2007149,344Not reported12 of 12
200890,826Not reported12 of 12
2009133,194Not reported12 of 12
2010206,5134.1%12 of 12
2011276,9825.5%12 of 12
2012290,1575.8%12 of 12
2013107,5722.2%12 of 12
2014146,6512.9%12 of 12
2015267,3495.4%12 of 12
2016466,1349.3%12 of 12
2017356,1207.1%12 of 12
2018547,29411.0%12 of 12
2019592,57711.9%12 of 12
2020401,0028.0%12 of 12
2021368,3417.4%12 of 12
2022454,9249.1%12 of 12
2023425,1678.5%12 of 12
2024522,90710.4%12 of 12
2025415,6828.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

281,696

US short tons. 2024: 353,812

SO₂, 2025

1

US short tons

NOx, 2025

165

US short tons

CO₂ per MWh, calculated

0.68 t

About 1,355 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 7813 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine121.0July 2000
2Natural Gas Fired Combustion Turbine121.0July 2000
3Natural Gas Fired Combustion Turbine164.0September 2000
4Natural Gas Fired Combustion Turbine164.0June 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oglethorpe Power Corporation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sewell Creek Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sewell Creek Energy

More plants operated by Oglethorpe Power Corporation

Questions about Sewell Creek Energy

How much power does Sewell Creek Energy produce?

Sewell Creek Energy reported 415,682 MWh (416 GWh) of net generation in 2025, a 8.3% capacity factor on 570 MW of nameplate capacity.

Where is Sewell Creek Energy?

Sewell Creek Energy is in Polk County, Georgia, at 33.9486, −85.2769. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Sewell Creek Energy?

EIA-860M for August 2026 lists Oglethorpe Power Corporation as the operator (EIA operator ID 13994). The operator is not always the owner.

When did Sewell Creek Energy start operating?

Its first generator began operating in June 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page