Natural gasOperatingMISO

Blue Lake

Natural gas power plant in Scott County, Minnesota. 362 MW of nameplate capacity across 5 generators, operated by Northern States Power Co - Minnesota.

Also known as Blue Lake Plant · EIA plant 8027

Analyst: free account, 1 question a day.

Shakopee Energy ParkMSC-Scott01 LLCBlue Lake5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
362 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
June 2005First generator online
Operator
Northern States Power Co - MinnesotaEIA operator ID 13781
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Scott County, MN44.7855, −93.4315
EIA plant ID
8027EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Blue Lake produces

Free · EIA-923

Net generation, 2025

435 GWh

434,752 MWh, final

Capacity factor, 2025

Not reported

2024: 6.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

63.1–434.8

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,794Not reported12 of 12
200114,085Not reported12 of 12
20022,138Not reported12 of 12
20034,585Not reported12 of 12
20043,032Not reported12 of 12
2005140,530Not reported12 of 12
2006146,471Not reported12 of 12
2007139,296Not reported12 of 12
200814,970Not reported12 of 12
200913,403Not reported12 of 12
2010117,3912.4%12 of 12
201195,0021.9%12 of 12
2012246,4685.0%12 of 12
2013109,0752.2%12 of 12
201425,1380.5%12 of 12
201569,2621.4%12 of 12
2016197,5084.0%12 of 12
201779,9171.6%12 of 12
2018105,2792.1%12 of 12
201967,0011.4%12 of 12
2020152,6773.1%12 of 12
2021145,2393.0%12 of 12
202288,3691.8%12 of 12
202363,1141.3%12 of 12
2024317,6766.5%12 of 12
2025434,752Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2024

Not reported

US short tons. 2023: Not reported

SO₂, 2024

2

US short tons

NOx, 2024

83

US short tons

2 of 6 EPA units reported CO₂ in 2024 (1, 2, 3, 4, 7, 8), matched to EIA plant 8027 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
7Natural Gas Fired Combustion Turbine166.3June 2005
8Natural Gas Fired Combustion Turbine166.3June 2005
BLL09Natural Gas Internal Combustion Engine9.8December 2025
BLL10Natural Gas Internal Combustion Engine9.8December 2025
BLL11Natural Gas Internal Combustion Engine9.8December 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Northern States Power Co - Minnesota as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Blue Lake and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Blue Lake

More plants operated by Northern States Power Co - Minnesota

Questions about Blue Lake

How much power does Blue Lake produce?

Blue Lake reported 434,752 MWh (435 GWh) of net generation in 2025.

Where is Blue Lake?

Blue Lake is in Scott County, Minnesota, at 44.7855, −93.4315. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Blue Lake?

EIA-860M for August 2026 lists Northern States Power Co - Minnesota as the operator (EIA operator ID 13781). The operator is not always the owner.

When did Blue Lake start operating?

Its first generator began operating in June 2005, according to EIA-860M.

Does InfraMap have power prices for Blue Lake?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Blue Lake, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page