Natural gasOperatingMISO

Waterford 1 & 2

Natural gas power plant in St Charles Parish, Louisiana. 445.5 MW of nameplate capacity across 1 generator, operated by Entergy Louisiana LLC.

Also known as Waterford 1 & 2 Power Plant · EIA plant 8056

Analyst: free account, 1 question a day.

Waterford 3Little GypsySt. Charles Power Station (LA)Taft Cogeneration FacilityWaterford 1 & 22 km
Open in the map
5 plants within 3.7 km, from EIA coordinates.

Key facts

Capacity
445.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 1975First generator online
Operator
Entergy Louisiana LLCEIA operator ID 11241
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
St Charles Parish, LA29.9989, −90.4768
EIA plant ID
8056EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Waterford 1 & 2 produces

Free · EIA-923

Net generation, 2025

339 GWh

338,954 MWh, final

Capacity factor, 2025

8.0%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.1–1.6

TWh a year. Low 2020, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,480,577Not reported12 of 12
20011,883,385Not reported12 of 12
20021,473,543Not reported12 of 12
20031,502,462Not reported12 of 12
20041,950,222Not reported12 of 12
20051,563,764Not reported12 of 12
2006371,565Not reported12 of 12
2007262,222Not reported4 of 12
2008547,510Not reported12 of 12
2009546,172Not reported12 of 12
2010812,83310.8%11 of 12
20111,036,28812.7%12 of 12
2012716,0058.7%12 of 12
2013963,56911.8%12 of 12
20141,232,64915.1%12 of 12
20151,341,06716.4%12 of 12
2016843,86610.3%12 of 12
2017829,18110.2%12 of 12
20181,613,66619.8%12 of 12
2019673,0098.2%12 of 12
2020133,3881.6%12 of 12
2021257,7213.2%12 of 12
2022371,4364.5%12 of 12
2023239,6942.9%12 of 12
2024318,679Not reported12 of 12
2025338,9548.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2021

169,404

US short tons. 2020: 88,189

SO₂, 2021

2

US short tons

NOx, 2021

207

US short tons

CO₂ per MWh, calculated

0.66 t

About 1,315 lb per MWh

3 of 3 EPA units reported CO₂ in 2021 (1, 2, 4), matched to EIA plant 8056 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

77,735

million gallons

Consumption, 2024

0

million gallons

Source

Mississippi River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.199

USGS SUI, HUC12 Bayou Fortier

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Steam Turbine445.5October 1975

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Entergy Louisiana LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Waterford 1 & 2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Waterford 1 & 2

More plants operated by Entergy Louisiana LLC

Questions about Waterford 1 & 2

How much power does Waterford 1 & 2 produce?

Waterford 1 & 2 reported 338,954 MWh (339 GWh) of net generation in 2025, a 8.0% capacity factor on 445.5 MW of nameplate capacity.

Where is Waterford 1 & 2?

Waterford 1 & 2 is in St Charles Parish, Louisiana, at 29.9989, −90.4768. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Waterford 1 & 2?

EIA-860M for August 2026 lists Entergy Louisiana LLC as the operator (EIA operator ID 11241). The operator is not always the owner.

When did Waterford 1 & 2 start operating?

Its first generator began operating in October 1975, according to EIA-860M.

Does InfraMap have power prices for Waterford 1 & 2?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Waterford 1 & 2, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page