GeothermalOperatingNEVP

Desert Peak Power Plant

Geothermal power plant in Lyon County, Nevada. 26 MW of nameplate capacity across 2 generators, operated by Ormat Nevada Inc.

Also known as EIA plant 10018

Analyst: free account, 1 question a day.

BradySierra Solar HybridPatua Acquisition Project, LLCSoda Lake 3New LahontanLahontanDesert Peak20 km
Open in the map
6 plants within 34 km, from EIA coordinates.

Key facts

Capacity
26 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2006First generator online
Operator
Ormat Nevada IncEIA operator ID 34691
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Lyon County, NV39.7540, −118.9535
EIA plant ID
10018EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Desert Peak produces

Free · EIA-923

Net generation, 2025

78.2 GWh

78,229 MWh, final

Capacity factor, 2025

34.3%

2024: 31.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

72.7–96.4

GWh a year. Low 2024, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200343Not reported12 of 12
200452,125Not reported12 of 12
200550,506Not reported12 of 12
200643,787Not reported12 of 12
200784,498Not reported12 of 12
200883,606Not reported12 of 12
200995,966Not reported12 of 12
2010110,75248.6%12 of 12
2011108,573Not reported12 of 12
201297,97042.9%12 of 12
201383,37336.6%12 of 12
201473,10332.1%12 of 12
201576,97333.8%12 of 12
201684,14636.8%12 of 12
201796,41242.3%12 of 12
201891,30140.1%12 of 12
201993,38541.0%12 of 12
202094,36541.3%12 of 12
202192,28640.5%12 of 12
202288,37838.8%12 of 12
202391,92840.4%12 of 12
202472,68431.8%12 of 12
202578,22934.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN2Geothermal15.0June 2006
OEC2Geothermal11.0June 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Ormat Nevada Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Desert Peak Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Desert Peak

More plants operated by Ormat Nevada Inc

Questions about Desert Peak

How much power does Desert Peak Power Plant produce?

Desert Peak Power Plant reported 78,229 MWh (78.2 GWh) of net generation in 2025, a 34.3% capacity factor on 26 MW of nameplate capacity.

Where is Desert Peak Power Plant?

Desert Peak Power Plant is in Lyon County, Nevada, at 39.7540, −118.9535. It is in the Nevada Power Company balancing area (NEVP).

Who operates Desert Peak Power Plant?

EIA-860M for August 2026 lists Ormat Nevada Inc as the operator (EIA operator ID 34691). The operator is not always the owner.

When did Desert Peak Power Plant start operating?

Its first generator began operating in June 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page