CoalOperatingPJM

Foster Wheeler Mt Carmel Cogen

Coal power plant in Northumberland County, Pennsylvania. 47.3 MW of nameplate capacity across 1 generator, operated by Mount Carmel Cogen Inc.

Also known as EIA plant 10343

Analyst: free account, 1 question a day.

Westwood Generation LLCMasser Farms Realty SolarLocust Ridge II LLCFoster Wheeler Mt Car…10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
47.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 1990First generator online
Operator
Mount Carmel Cogen IncEIA operator ID 49889
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Northumberland County, PA40.8112, −76.4530
EIA plant ID
10343EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Foster Wheeler Mt Carmel Cogen produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 11.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–315.5

GWh a year. Low 2025, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001340,490Not reported12 of 12
2002198,609Not reported12 of 12
2003314,285Not reported12 of 12
2004327,427Not reported12 of 12
2005336,854Not reported12 of 12
2006307,480Not reported12 of 12
2007122,025Not reported5 of 12
2008126,788Not reported6 of 12
2009292,856Not reported12 of 12
2010301,75872.8%12 of 12
2011272,55865.8%12 of 12
2012285,32968.7%12 of 12
2013283,27668.4%12 of 12
2014279,30667.4%12 of 12
2015294,02171.0%12 of 12
2016307,59674.0%12 of 12
2017315,45076.1%12 of 12
2018266,62964.3%12 of 12
201981,19519.6%12 of 12
202041,73010.0%12 of 12
20212,0720.5%12 of 12
2022106,01425.6%12 of 12
2023103,71825.0%12 of 12
202445,57711.0%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2024

255,393

US short tons. 2023: 286,383

SO₂, 2024

472

US short tons

NOx, 2024

409

US short tons

CO₂ per MWh, calculated

5.60 t

About 11,207 lb per MWh

1 of 1 EPA units reported CO₂ in 2024 (SG-101), matched to EIA plant 10343 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TG1Conventional Steam Coal47.3January 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Mount Carmel Cogen Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Foster Wheeler Mt Carmel Cogen and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Foster Wheeler Mt Carmel Cogen

Questions about Foster Wheeler Mt Carmel Cogen

How much power does Foster Wheeler Mt Carmel Cogen produce?

Foster Wheeler Mt Carmel Cogen reported 0 MWh (0 MWh) of net generation in 2025.

Where is Foster Wheeler Mt Carmel Cogen?

Foster Wheeler Mt Carmel Cogen is in Northumberland County, Pennsylvania, at 40.8112, −76.4530. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Foster Wheeler Mt Carmel Cogen?

EIA-860M for August 2026 lists Mount Carmel Cogen Inc as the operator (EIA operator ID 49889). The operator is not always the owner.

When did Foster Wheeler Mt Carmel Cogen start operating?

Its first generator began operating in January 1990, according to EIA-860M.

Does InfraMap have power prices for Foster Wheeler Mt Carmel Cogen?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Foster Wheeler Mt Carmel Cogen, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page