Natural gasOperatingCAISO

Badger Creek Limited

Natural gas power plant in Kern County, California. 46 MW of nameplate capacity across 1 generator, operated by WCAC Operating Company.

Also known as Badger Creek Limited Power Plant · EIA plant 10650

Analyst: free account, 1 question a day.

Double C Generation Limited PartnershipHigh Sierra LimitedKern Front LimitedAmazon Bakersfield 1 Solar ProjectWestern Power & Steam IncBadger Creek Limited2 km
Open in the map
6 plants within 5.0 km, from EIA coordinates.

Key facts

Capacity
46 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 1991First generator online
Operator
WCAC Operating CompanyEIA operator ID 60662
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA35.4837, −119.0299
EIA plant ID
10650EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Badger Creek Limited produces

Free · EIA-923

Net generation, 2025

5.22 GWh

5,216 MWh, final

Capacity factor, 2025

1.3%

2024: 3.3%

January to July 2026

707 MWh

Provisional

Range, 2015 to 2025

3.3–122.1

GWh a year. Low 2016, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000346,226Not reported12 of 12
2001245,537Not reported12 of 12
2002352,524Not reported12 of 12
2003373,101Not reported12 of 12
2004363,666Not reported12 of 12
2005353,010Not reported12 of 12
2006341,219Not reported12 of 12
2007363,756Not reported12 of 12
2008360,475Not reported12 of 12
2009362,547Not reported12 of 12
2010381,19494.6%12 of 12
2011177,28144.0%12 of 12
2012210,20952.0%12 of 12
2013247,29961.4%12 of 12
2014233,43957.9%12 of 12
2015122,14030.3%12 of 12
20163,3390.8%12 of 12
201715,9824.0%12 of 12
20187,5561.9%12 of 12
201914,1253.5%12 of 12
202018,6074.6%12 of 12
202122,1965.5%12 of 12
202233,4738.3%12 of 12
202324,8126.2%12 of 12
202413,1643.3%12 of 12
20255,2161.3%12 of 12
2026 (provisional, partial year)7070.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

3,019

US short tons. 2024: 5,100

SO₂, 2025

0

US short tons

NOx, 2025

1

US short tons

CO₂ per MWh, calculated

0.58 t

About 1,158 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GT1), matched to EIA plant 10650 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine46.0April 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists WCAC Operating Company as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Badger Creek Limited and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Badger Creek Limited

More plants operated by WCAC Operating Company

Questions about Badger Creek Limited

How much power does Badger Creek Limited produce?

Badger Creek Limited reported 5,216 MWh (5.22 GWh) of net generation in 2025, a 1.3% capacity factor on 46 MW of nameplate capacity. From January to July 2026 it reported 707 MWh, which is provisional.

Where is Badger Creek Limited?

Badger Creek Limited is in Kern County, California, at 35.4837, −119.0299. It is in the California Independent System Operator balancing area (CISO).

Who operates Badger Creek Limited?

EIA-860M for August 2026 lists WCAC Operating Company as the operator (EIA operator ID 60662). The operator is not always the owner.

When did Badger Creek Limited start operating?

Its first generator began operating in April 1991, according to EIA-860M.

Does InfraMap have power prices for Badger Creek Limited?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Badger Creek Limited, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page