Natural gasOperatingCAISO

McKittrick Limited

Natural gas power plant in Kern County, California. 46 MW of nameplate capacity across 1 generator, operated by WCAC Operating Company.

Also known as McKittrick Limited Power Plant · EIA plant 50612

Analyst: free account, 1 question a day.

Cymric 6Z CogenWelport Lease ProjectPumpjack Solar ICymric 31X CogenMcKittrick Limited2 km
Open in the map
6 plants within 4.9 km, from EIA coordinates.

Key facts

Capacity
46 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 1991First generator online
Operator
WCAC Operating CompanyEIA operator ID 60662
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA35.3195, −119.6620
EIA plant ID
50612EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McKittrick Limited produces

Free · EIA-923

Net generation, 2025

5.26 GWh

5,258 MWh, final

Capacity factor, 2025

1.3%

2024: 2.6%

January to July 2026

854 MWh

Provisional

Range, 2015 to 2025

5.3–62.6

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000379,072Not reported12 of 12
2001274,336Not reported12 of 12
2002383,114Not reported12 of 12
2003392,259Not reported12 of 12
2004368,518Not reported12 of 12
2005325,760Not reported12 of 12
2006345,577Not reported12 of 12
2007373,985Not reported12 of 12
2008377,683Not reported12 of 12
2009393,247Not reported12 of 12
2010368,35991.4%12 of 12
2011345,29885.7%12 of 12
2012137,65734.1%12 of 12
2013144,05835.7%12 of 12
2014137,67934.2%12 of 12
201562,61115.5%12 of 12
20167,2481.8%12 of 12
201722,5915.6%12 of 12
201821,7425.4%12 of 12
201915,3873.8%12 of 12
202016,0964.0%12 of 12
202117,0484.2%12 of 12
20229,9232.5%12 of 12
202336,8899.2%12 of 12
202410,6792.6%12 of 12
20255,2581.3%12 of 12
2026 (provisional, partial year)8540.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2,816

US short tons. 2024: 6,252

SO₂, 2025

0

US short tons

NOx, 2025

1

US short tons

CO₂ per MWh, calculated

0.54 t

About 1,071 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GT1), matched to EIA plant 50612 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine46.0October 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists WCAC Operating Company as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McKittrick Limited and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McKittrick Limited

More plants operated by WCAC Operating Company

Questions about McKittrick Limited

How much power does McKittrick Limited produce?

McKittrick Limited reported 5,258 MWh (5.26 GWh) of net generation in 2025, a 1.3% capacity factor on 46 MW of nameplate capacity. From January to July 2026 it reported 854 MWh, which is provisional.

Where is McKittrick Limited?

McKittrick Limited is in Kern County, California, at 35.3195, −119.6620. It is in the California Independent System Operator balancing area (CISO).

Who operates McKittrick Limited?

EIA-860M for August 2026 lists WCAC Operating Company as the operator (EIA operator ID 60662). The operator is not always the owner.

When did McKittrick Limited start operating?

Its first generator began operating in October 1991, according to EIA-860M.

Does InfraMap have power prices for McKittrick Limited?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to McKittrick Limited, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page