Key facts

Capacity
806.2 MWNameplate
Generators
7 operatingEIA-860M, August 2026
Operating since
May 1972First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Maricopa County, AZ33.4225, −111.9122
EIA plant ID
116EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ocotillo produces

Free · EIA-923

Net generation, 2025

443 GWh

443,322 MWh, final

Capacity factor, 2025

6.3%

2024: Not reported

January to July 2026

343 GWh

Provisional

Range, 2017 to 2025

220.1–772.5

GWh a year. Low 2017, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000749,070Not reported12 of 12
2001996,900Not reported12 of 12
2002295,374Not reported12 of 12
2003186,560Not reported10 of 12
2004259,190Not reported12 of 12
2005153,917Not reported12 of 12
2006146,063Not reported12 of 12
2007178,375Not reported12 of 12
2008Not reportedNot reported0 of 12
200981,461Not reported12 of 12
201055,7771.9%12 of 12
201191,8783.1%12 of 12
201274,6842.5%12 of 12
2013118,7054.1%12 of 12
201466,3873.4%8 of 12
2015Not reportedNot reported0 of 12
20162,3380.9%1 of 12
2017220,0977.5%12 of 12
2018270,7609.3%12 of 12
20199,397Not reported2 of 12
2020740,9149.2%12 of 12
2021668,4008.3%12 of 12
2022772,545Not reported12 of 12
2023640,869Not reported12 of 12
2024539,884Not reported12 of 12
2025443,3226.3%12 of 12
2026 (provisional, partial year)342,5318.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

241,948

US short tons. 2024: 282,941

SO₂, 2025

1

US short tons

NOx, 2025

17

US short tons

CO₂ per MWh, calculated

0.55 t

About 1,092 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (1, 2, GT3, GT4, GT5, GT6, GT7), matched to EIA plant 116 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combustion Turbine53.1May 1972
GT2Natural Gas Fired Combustion Turbine53.1July 1973
GT3Natural Gas Fired Combustion Turbine140.0April 2019
GT4Natural Gas Fired Combustion Turbine140.0April 2019
GT5Natural Gas Fired Combustion Turbine140.0May 2019
GT6Natural Gas Fired Combustion Turbine140.0April 2019
GT7Natural Gas Fired Combustion Turbine140.0April 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ocotillo and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ocotillo

More plants operated by Arizona Public Service Co

Questions about Ocotillo

How much power does Ocotillo produce?

Ocotillo reported 443,322 MWh (443 GWh) of net generation in 2025, a 6.3% capacity factor on 806.2 MW of nameplate capacity. From January to July 2026 it reported 343 GWh, which is provisional.

Where is Ocotillo?

Ocotillo is in Maricopa County, Arizona, at 33.4225, −111.9122. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Ocotillo?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

When did Ocotillo start operating?

Its first generator began operating in May 1972, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page