Natural gasOilOperatingAZPS

Yucca

Natural gas and oil power plant in Yuma County, Arizona. 422.4 MW of nameplate capacity across 8 generators, operated by Arizona Public Service Co.

Also known as Yucca Power Plant · EIA plant 120

Analyst: free account, 1 question a day.

Yuma Cogeneration AssociatesSiphon Drop Power PlantArizona Western College PVDrop 1Foothills Solar Plant HybridYucca10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
422.4 MWNatural gas 324.7 · Oil 97.7
Generators
8 operatingEIA-860M, August 2026
Operating since
April 1959First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Yuma County, AZ32.7214, −114.7106
EIA plant ID
120EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Yucca produces

Free · EIA-923

Net generation, 2025

200 GWh

200,127 MWh, final

Capacity factor, 2025

5.4%

2024: Not reported

January to July 2026

58.2 GWh

Provisional

Range, 2015 to 2025

200.1–456.8

GWh a year. Low 2025, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000373,513Not reported12 of 12
2001561,496Not reported12 of 12
2002400,642Not reported12 of 12
2003232,721Not reported10 of 12
2004256,852Not reported12 of 12
2005245,392Not reported12 of 12
2006295,469Not reported12 of 12
2007318,562Not reported12 of 12
2008325,310Not reported12 of 12
2009Not reportedNot reported0 of 12
2010421,66612.5%12 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
201497,3768.0%4 of 12
2015330,4148.9%12 of 12
2016360,7049.7%12 of 12
2017312,6858.4%12 of 12
2018456,77712.3%12 of 12
2019414,04111.1%12 of 12
2020416,76011.2%12 of 12
2021340,5909.1%12 of 12
2022293,4437.9%12 of 12
2023236,544Not reported12 of 12
2024298,457Not reported12 of 12
2025200,1275.4%12 of 12
2026 (provisional, partial year)58,1562.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2023

99,532

US short tons. 2022: 178,221

SO₂, 2023

1

US short tons

NOx, 2023

9

US short tons

CO₂ per MWh, calculated

0.42 t

About 842 lb per MWh

3 of 3 EPA units reported CO₂ in 2023 (1, CT5, CT6), matched to EIA plant 120 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combustion Turbine22.3July 1971
GT2Natural Gas Fired Combustion Turbine22.3July 1971
GT3Natural Gas Fired Combustion Turbine72.4June 1973
GT4Petroleum Liquids72.4July 1974
GT5Natural Gas Fired Combustion Turbine60.5June 2008
GT6Natural Gas Fired Combustion Turbine60.5June 2008
GT21Petroleum Liquids25.3December 1978
ST1Natural Gas Steam Turbine86.7April 1959

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Yucca and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Yucca

More plants operated by Arizona Public Service Co

Questions about Yucca

How much power does Yucca produce?

Yucca reported 200,127 MWh (200 GWh) of net generation in 2025, a 5.4% capacity factor on 422.4 MW of nameplate capacity. From January to July 2026 it reported 58.2 GWh, which is provisional.

Where is Yucca?

Yucca is in Yuma County, Arizona, at 32.7214, −114.7106. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Yucca?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

Is Yucca a natural gas or a oil plant?

Both. Natural gas capacity totals 324.7 MW and oil capacity totals 97.7 MW.

When did Yucca start operating?

Its first generator began operating in April 1959, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page