Solar and battery storage project in Yuma County, Arizona. 73 MW of nameplate capacity across 3 generators, operated by Arizona Public Service Co.

Also known as EIA plant 57997

This project groups Foothills Solar Plant Hybrid (EIA 57997). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Arizona Western College PVYuma Cogeneration AssociatesSiphon Drop Power PlantYuccaFoothills Solar Plant Hybrid10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
73 MWSolar 38.0 · Battery storage 35.0
Generators
3 operatingEIA-860M, August 2026
Operating since
March 2013First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Yuma County, AZ32.6486, −114.4287
EIA plant ID
57997EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Foothills Solar Plant Hybrid produces

Free · EIA-923

Net generation, 2025

80.2 GWh

80,232 MWh, final

Capacity factor, 2025

25.9%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

80.2–110.8

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201361,10051.1%10 of 12
201480,65428.7%11 of 12
2015110,82036.1%12 of 12
201696,91531.5%12 of 12
201795,58831.2%12 of 12
201893,02530.3%12 of 12
201995,51031.2%12 of 12
202097,82631.8%12 of 12
2021104,27934.0%12 of 12
202296,85431.6%12 of 12
202381,080Not reported9 of 12
202497,802Not reported12 of 12
202580,23225.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FH38MBatteries35.0April 2023
PV1Solar Photovoltaic18.0March 2013
PV2Solar Photovoltaic20.0December 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Foothills Solar Plant Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Foothills Solar Plant Hybrid

More plants operated by Arizona Public Service Co

Questions about Foothills Solar Plant Hybrid

How much power does Foothills Solar Plant Hybrid produce?

Foothills Solar Plant Hybrid reported 80,232 MWh (80.2 GWh) of net generation in 2025, a 25.9% capacity factor on 73 MW of nameplate capacity.

Where is Foothills Solar Plant Hybrid?

Foothills Solar Plant Hybrid is in Yuma County, Arizona, at 32.6486, −114.4287. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Foothills Solar Plant Hybrid?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

Is Foothills Solar Plant Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 38 MW and battery storage capacity totals 35 MW.

When did Foothills Solar Plant Hybrid start operating?

Its first generator began operating in March 2013, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page