H Wilson Sundt Generating Station

Natural gas power plant in Pima County, Arizona. 528.9 MW of nameplate capacity across 14 generators, operated by Tucson Electric Power Co.

Also known as EIA plant 126

Analyst: free account, 1 question a day.

Davis Monthan AFB (AZ) West AirfieldRaptor RidgeValencia SolarTJX TucsonActus Lend Lease DMAFBH Wilson Sundt2 km
Open in the map
5 plants within 4.6 km, from EIA coordinates.

Key facts

Capacity
528.9 MWNameplate
Generators
14 operatingEIA-860M, August 2026
Operating since
June 1962First generator online
Operator
Tucson Electric Power CoEIA operator ID 24211
Grid
TEPCBalancing authority TEPC
Price nodes
None linkedNo verified ISO node
Location
Pima County, AZ32.1600, −110.9047
EIA plant ID
126EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power H Wilson Sundt produces

Free · EIA-923

Net generation, 2025

1.64 TWh

1,637,535 MWh, final. 10 of 12 months reported

Capacity factor, 2025

42.4%

2024: 38.9%

January to July 2026

761 GWh

Provisional. 6 of 7 months reported

Range, 2015 to 2024

0.8–1.8

TWh a year. Low 2017, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,639,965Not reported12 of 12
20011,645,666Not reported12 of 12
20021,403,955Not reported12 of 12
2003768,581Not reported9 of 12
20041,150,577Not reported12 of 12
20051,152,849Not reported12 of 12
2006942,775Not reported12 of 12
20071,038,986Not reported12 of 12
2008Not reportedNot reported0 of 12
2009240,320Not reported4 of 12
2010856,43617.5%12 of 12
2011841,76818.8%11 of 12
2012803,24616.4%12 of 12
2013428,27915.1%7 of 12
2014Not reportedNot reported0 of 12
2015771,756Not reported12 of 12
2016777,277Not reported12 of 12
2017752,41015.4%12 of 12
20181,412,42328.9%12 of 12
2019232,905Not reported2 of 12
20201,089,504Not reported9 of 12
2021818,62919.3%11 of 12
2022937,83720.2%12 of 12
2023707,60830.8%6 of 12
20241,805,54138.9%12 of 12
20251,637,53542.4%10 of 12
2026 (provisional, partial year)760,77133.1%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

814,835

US short tons. 2024: 663,191

SO₂, 2025

24

US short tons

NOx, 2025

1,238

US short tons

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 126 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

691

million gallons

Consumption, 2024

592

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

High · 0.712

USGS SUI, HUC12 Julian Wash

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Natural Gas Steam Turbine173.3July 1967
GT1Natural Gas Fired Combustion Turbine27.0December 1972
GT2Natural Gas Fired Combustion Turbine27.0December 1972
RIC1Natural Gas Internal Combustion Engine18.8March 2020
RIC2Natural Gas Internal Combustion Engine18.8March 2020
RIC3Natural Gas Internal Combustion Engine18.8March 2020
RIC4Natural Gas Internal Combustion Engine18.8March 2020
RIC5Natural Gas Internal Combustion Engine18.8March 2020
RIC6Natural Gas Internal Combustion Engine18.8December 2019
RIC7Natural Gas Internal Combustion Engine18.8December 2019
RIC8Natural Gas Internal Combustion Engine18.8December 2019
RIC9Natural Gas Internal Combustion Engine18.8December 2019
RIC10Natural Gas Internal Combustion Engine18.8December 2019
ST3Natural Gas Steam Turbine113.6June 1962

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tucson Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query H Wilson Sundt Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near H Wilson Sundt

More plants operated by Tucson Electric Power Co

Questions about H Wilson Sundt

How much power does H Wilson Sundt Generating Station produce?

H Wilson Sundt Generating Station reported 1,637,535 MWh (1.64 TWh) of net generation in 2025, a 42.4% capacity factor on 528.9 MW of nameplate capacity. From January to July 2026 it reported 761 GWh, which is provisional. 10 of 12 months were reported for 2025.

Where is H Wilson Sundt Generating Station?

H Wilson Sundt Generating Station is in Pima County, Arizona, at 32.1600, −110.9047. It is in the Tucson Electric Power Company balancing area (TEPC).

Who operates H Wilson Sundt Generating Station?

EIA-860M for August 2026 lists Tucson Electric Power Co as the operator (EIA operator ID 24211). The operator is not always the owner.

When did H Wilson Sundt Generating Station start operating?

Its first generator began operating in June 1962, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page