CoalSolarOperatingTEPC

Springerville

Coal power plant in Apache County, Arizona. 1,779.2 MW of nameplate capacity across 7 generators, operated by Tucson Electric Power Co.

Also known as EIA plant 8223

Analyst: free account, 1 question a day.

Borderlands Wind, LLCCoronadoSpringerville10 km
Open in the map
2 plants within 31 km, from EIA coordinates.

Key facts

Capacity
1,779.2 MWCoal 1,765.8 · Solar 13.4
Generators
7 operatingEIA-860M, August 2026
Operating since
June 1985First generator online
Operator
Tucson Electric Power CoEIA operator ID 24211
Grid
TEPCBalancing authority TEPC
Price nodes
None linkedNo verified ISO node
Location
Apache County, AZ34.3186, −109.1639
EIA plant ID
8223EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Springerville produces

Free · EIA-923

Net generation, 2025

5.55 TWh

5,549,274 MWh, final

Capacity factor, 2025

35.6%

2024: 36.0%

January to July 2026

2.54 TWh

Provisional

Range, 2015 to 2025

5.5–10.1

TWh a year. Low 2025, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,876,943Not reported12 of 12
20015,970,750Not reported12 of 12
20025,830,542Not reported12 of 12
20035,952,161Not reported12 of 12
20045,705,735Not reported12 of 12
20055,577,373Not reported12 of 12
20065,801,431Not reported12 of 12
20075,912,107Not reported12 of 12
20088,871,873Not reported12 of 12
20098,480,922Not reported12 of 12
201011,129,391Not reported12 of 12
201111,377,95173.8%12 of 12
201210,157,28865.7%12 of 12
201311,458,385Not reported12 of 12
201410,539,848Not reported12 of 12
201510,061,86464.6%12 of 12
20169,147,05958.5%12 of 12
20178,635,91555.4%12 of 12
20189,961,84063.9%12 of 12
20197,945,33451.0%12 of 12
2020761,39859.4%1 of 12
20218,143,640Not reported12 of 12
20227,144,468Not reported12 of 12
20232,583,06933.4%6 of 12
20245,632,01136.0%12 of 12
20255,549,27435.6%12 of 12
2026 (provisional, partial year)2,536,55828.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

6.41M

US short tons. 2024: 6.55M

SO₂, 2025

3,968

US short tons

NOx, 2025

3,304

US short tons

CO₂ per MWh, calculated

1.16 t

About 2,311 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 4, TS3), matched to EIA plant 8223 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

3,534

million gallons

Consumption, 2024

1,843

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Severe · 1.000

USGS SUI, HUC12 Henry Platt Springs

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal424.8June 1985
2Conventional Steam Coal424.8June 1990
3Conventional Steam Coal458.1July 2006
4Conventional Steam Coal458.1December 2009
SGSSSolar Photovoltaic3.7May 2001
SGSS1Solar Photovoltaic1.4December 2010
WMSSolar Photovoltaic8.3December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tucson Electric Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Springerville and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Springerville

More plants operated by Tucson Electric Power Co

Questions about Springerville

How much power does Springerville produce?

Springerville reported 5,549,274 MWh (5.55 TWh) of net generation in 2025, a 35.6% capacity factor on 1,779.2 MW of nameplate capacity. From January to July 2026 it reported 2.54 TWh, which is provisional.

Where is Springerville?

Springerville is in Apache County, Arizona, at 34.3186, −109.1639. It is in the Tucson Electric Power Company balancing area (TEPC).

Who operates Springerville?

EIA-860M for August 2026 lists Tucson Electric Power Co as the operator (EIA operator ID 24211). The operator is not always the owner.

When did Springerville start operating?

Its first generator began operating in June 1985, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page