HydroOperatingISO-NE

Deerfield 5

Hydro power plant in Berkshire County, Massachusetts. 17.5 MW of nameplate capacity across 1 generator, operated by Great River Hydro, LLC.

Also known as Deerfield #5 Station · EIA plant 1620

Analyst: free account, 1 question a day.

Fife BrookShermanNew England Wind LLCCharlemont AFairhaven EDeerfield 52 km
Open in the map
6 plants within 7.4 km, from EIA coordinates.

Key facts

Capacity
17.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 1974First generator online
Operator
Great River Hydro, LLCEIA operator ID 61122
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Berkshire County, MA42.6912, −72.9561
EIA plant ID
1620EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Deerfield 5 produces

Free · EIA-923

Net generation, 2025

44.4 GWh

44,427 MWh, final

Capacity factor, 2025

29.0%

2024: 27.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

37.5–63.6

GWh a year. Low 2016, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200139,239Not reported12 of 12
200253,481Not reported12 of 12
200360,543Not reported12 of 12
200456,255Not reported12 of 12
200543,258Not reported12 of 12
200663,028Not reported12 of 12
20078,209Not reported12 of 12
200865,626Not reported12 of 12
200967,784Not reported12 of 12
201055,20836.0%12 of 12
201164,95042.4%12 of 12
201240,30826.2%12 of 12
201353,28434.8%12 of 12
201453,05934.6%12 of 12
201540,25526.3%12 of 12
201637,47824.4%12 of 12
201760,97639.8%12 of 12
201863,57741.5%12 of 12
201952,16134.0%12 of 12
202048,52731.6%12 of 12
202162,70140.9%12 of 12
202243,45428.3%12 of 12
202363,12841.2%12 of 12
202442,08227.4%12 of 12
202544,42729.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric17.5October 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Great River Hydro, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Deerfield 5 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Deerfield 5

More plants operated by Great River Hydro, LLC

Questions about Deerfield 5

How much power does Deerfield 5 produce?

Deerfield 5 reported 44,427 MWh (44.4 GWh) of net generation in 2025, a 29.0% capacity factor on 17.5 MW of nameplate capacity.

Where is Deerfield 5?

Deerfield 5 is in Berkshire County, Massachusetts, at 42.6912, −72.9561. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Deerfield 5?

EIA-860M for August 2026 lists Great River Hydro, LLC as the operator (EIA operator ID 61122). The operator is not always the owner.

When did Deerfield 5 start operating?

Its first generator began operating in October 1974, according to EIA-860M.

Does InfraMap have power prices for Deerfield 5?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Deerfield 5, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page