Natural gasOilOperatingMISO

Northeast (MI)

Natural gas and oil power plant in Macomb County, Michigan. 113.8 MW of nameplate capacity across 6 generators, operated by DTE Electric Company.

Also known as EIA plant 1734

Analyst: free account, 1 question a day.

O'Shea Solar FarmDelrayWyandotteRiverview Energy SystemsNortheast (MI)10 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
113.8 MWNatural gas 71.4 · Oil 42.4
Generators
6 operatingEIA-860M, August 2026
Operating since
May 1966First generator online
Operator
DTE Electric CompanyEIA operator ID 5109
Grid
MISOBalancing authority MISO
Price nodes
3 MISO nodesResource nodes with prices
Location
Macomb County, MI42.4500, −83.0381
EIA plant ID
1734EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Northeast (MI) produces

Free · EIA-923

Net generation, 2025

14.8 GWh

14,796 MWh, final

Capacity factor, 2025

1.5%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.2–14.8

GWh a year. Low 2015, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200029,390Not reported12 of 12
200110,166Not reported12 of 12
20022,396Not reported12 of 12
20034,373Not reported11 of 12
2004516Not reported12 of 12
20053,760Not reported12 of 12
20062,545Not reported12 of 12
20071,980Not reported12 of 12
200888Not reported12 of 12
2009−1,427Not reported12 of 12
20108420.1%12 of 12
20111,4690.1%12 of 12
20123130.0%12 of 12
20135280.0%12 of 12
20144900.0%12 of 12
20151900.0%12 of 12
20161,160Not reported12 of 12
20172,6700.2%12 of 12
20186,5560.6%12 of 12
20191,0900.1%12 of 12
20202,4340.2%12 of 12
202110,2250.9%12 of 12
20228,3390.7%12 of 12
20231,7960.2%12 of 12
20245,8580.6%12 of 12
202514,7961.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Fired Combustion Turbine16.0June 1966
3Natural Gas Fired Combustion Turbine16.0May 1966
4Natural Gas Fired Combustion Turbine16.0May 1966
5Natural Gas Fired Combustion Turbine23.4June 1971
6Petroleum Liquids21.2May 1971
7Petroleum Liquids21.2May 1971

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists DTE Electric Company as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Northeast (MI) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Northeast (MI)

More plants operated by DTE Electric Company

Questions about Northeast (MI)

How much power does Northeast (MI) produce?

Northeast (MI) reported 14,796 MWh (14.8 GWh) of net generation in 2025, a 1.5% capacity factor on 113.8 MW of nameplate capacity.

Where is Northeast (MI)?

Northeast (MI) is in Macomb County, Michigan, at 42.4500, −83.0381. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Northeast (MI)?

EIA-860M for August 2026 lists DTE Electric Company as the operator (EIA operator ID 5109). The operator is not always the owner.

Is Northeast (MI) a natural gas or a oil plant?

Both. Natural gas capacity totals 71.4 MW and oil capacity totals 42.4 MW.

When did Northeast (MI) start operating?

Its first generator began operating in May 1966, according to EIA-860M.

Does InfraMap have power prices for Northeast (MI)?

Yes. InfraMap has MISO day-ahead and real-time prices at 3 price nodes linked to Northeast (MI), with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page