OilOperatingSPP

McCook

Oil power plant in Red Willow County, Nebraska. 56.7 MW of nameplate capacity across 1 generator, operated by Nebraska Public Power District.

Also known as McCook Power Plant · EIA plant 2271

Analyst: free account, 1 question a day.

CambridgeOberlin (KS)CurtisMcCook25 km
Open in the map
3 plants within 47 km, from EIA coordinates.

Key facts

Capacity
56.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 1973First generator online
Operator
Nebraska Public Power DistrictEIA operator ID 13337
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Red Willow County, NE40.2214, −100.6508
EIA plant ID
2271EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McCook produces

Free · EIA-923

Net generation, 2025

3.46 GWh

3,460 MWh, final

Capacity factor, 2025

0.7%

2024: 0.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.3–3.8

GWh a year. Low 2017, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20004,178Not reported12 of 12
2001913Not reported12 of 12
20021,344Not reported12 of 12
20032,210Not reported12 of 12
20041,050Not reported12 of 12
20051,859Not reported12 of 12
2006559Not reported12 of 12
2007636Not reported12 of 12
20081,787Not reported12 of 12
2009401Not reported12 of 12
20101530.0%12 of 12
20114100.1%12 of 12
20121170.0%12 of 12
20133420.1%12 of 12
20147130.1%12 of 12
20154370.1%12 of 12
20166030.1%12 of 12
20172910.1%12 of 12
20185280.1%12 of 12
20197170.1%12 of 12
20206830.1%12 of 12
20211,9850.4%12 of 12
20222,4300.5%12 of 12
20231,4570.3%12 of 12
20243,7520.8%12 of 12
20253,4600.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

3,782

US short tons. 2024: 4,070

SO₂, 2025

12

US short tons

NOx, 2025

28

US short tons

CO₂ per MWh, calculated

1.09 t

About 2,186 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1A, 1B), matched to EIA plant 2271 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids56.7June 1973

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nebraska Public Power District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McCook and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McCook

More plants operated by Nebraska Public Power District

Questions about McCook

How much power does McCook produce?

McCook reported 3,460 MWh (3.46 GWh) of net generation in 2025, a 0.7% capacity factor on 56.7 MW of nameplate capacity.

Where is McCook?

McCook is in Red Willow County, Nebraska, at 40.2214, −100.6508. It is in the Southwest Power Pool balancing area (SWPP).

Who operates McCook?

EIA-860M for August 2026 lists Nebraska Public Power District as the operator (EIA operator ID 13337). The operator is not always the owner.

When did McCook start operating?

Its first generator began operating in June 1973, according to EIA-860M.

Does InfraMap have power prices for McCook?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to McCook, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page