Natural gasOperatingNEVP

Fort Churchill

Natural gas power plant in Lyon County, Nevada. 230 MW of nameplate capacity across 2 generators, operated by Sierra Pacific Power Co.

Also known as Fort Churchill Generating Station · EIA plant 2330

Analyst: free account, 1 question a day.

Whitegrass No. 1LahontanNew LahontanWashoeFleishFort Churchill25 km
Open in the map
6 plants within 43 km, from EIA coordinates.

Key facts

Capacity
230 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1968First generator online
Operator
Sierra Pacific Power CoEIA operator ID 17166
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Lyon County, NV39.1281, −119.1322
EIA plant ID
2330EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fort Churchill produces

Free · EIA-923

Net generation, 2025

469 GWh

468,774 MWh, final

Capacity factor, 2025

23.3%

2024: 25.1%

January to July 2026

324 GWh

Provisional

Range, 2016 to 2025

271.9–642.0

GWh a year. Low 2016, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,237,913Not reported12 of 12
20011,328,149Not reported12 of 12
20021,052,429Not reported12 of 12
2003993,456Not reported12 of 12
2004897,845Not reported12 of 12
2005927,248Not reported12 of 12
2006811,362Not reported12 of 12
2007932,590Not reported12 of 12
2008798,864Not reported12 of 12
2009313,087Not reported12 of 12
2010142,2547.1%12 of 12
201191,8674.6%12 of 12
2012250,00512.4%12 of 12
2013286,71914.2%12 of 12
2014174,7548.7%12 of 12
2015305,33318.1%10 of 12
2016271,86313.5%12 of 12
2017380,37418.9%12 of 12
2018479,81923.8%12 of 12
2019642,02231.9%12 of 12
2020620,74730.7%12 of 12
2021510,30725.3%12 of 12
2022549,79627.3%12 of 12
2023418,21720.8%12 of 12
2024506,91325.1%12 of 12
2025468,77423.3%12 of 12
2026 (provisional, partial year)323,52027.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

339,752

US short tons. 2024: 363,150

SO₂, 2025

2

US short tons

NOx, 2025

417

US short tons

CO₂ per MWh, calculated

0.72 t

About 1,450 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 2330 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

18,842

million gallons

Consumption, 2024

879

million gallons

Source

Wells

Ground, Fresh. Recirculating with cooling pond

Watershed stress

Low · 0.376

USGS SUI, HUC12 Fox Ditch-Walker River

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine115.0September 1968
2Natural Gas Steam Turbine115.0September 1971

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sierra Pacific Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fort Churchill and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fort Churchill

More plants operated by Sierra Pacific Power Co

Questions about Fort Churchill

How much power does Fort Churchill produce?

Fort Churchill reported 468,774 MWh (469 GWh) of net generation in 2025, a 23.3% capacity factor on 230 MW of nameplate capacity. From January to July 2026 it reported 324 GWh, which is provisional.

Where is Fort Churchill?

Fort Churchill is in Lyon County, Nevada, at 39.1281, −119.1322. It is in the Nevada Power Company balancing area (NEVP).

Who operates Fort Churchill?

EIA-860M for August 2026 lists Sierra Pacific Power Co as the operator (EIA operator ID 17166). The operator is not always the owner.

When did Fort Churchill start operating?

Its first generator began operating in September 1968, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page