Key facts

Capacity
444.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
January 1965First generator online
Operator
Southwestern Public Service CoEIA operator ID 17718
Grid
SPPBalancing authority SWPP
Price nodes
3 SPP nodesResource nodes with prices
Location
Lea County, NM32.7131, −103.3533
EIA plant ID
2454EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cunningham produces

Free · EIA-923

Net generation, 2025

1.79 TWh

1,792,031 MWh, final

Capacity factor, 2025

46.1%

2024: Not reported

January to July 2026

936 GWh

Provisional

Range, 2015 to 2025

0.9–1.8

TWh a year. Low 2021, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,453,157Not reported12 of 12
20011,380,118Not reported12 of 12
20021,215,956Not reported12 of 12
20031,058,279Not reported12 of 12
20041,234,256Not reported12 of 12
20051,405,552Not reported12 of 12
20061,392,802Not reported12 of 12
20071,397,085Not reported12 of 12
20081,457,622Not reported12 of 12
2009884,913Not reported12 of 12
2010830,62918.3%12 of 12
20111,133,92824.9%12 of 12
20121,040,78422.8%12 of 12
20131,001,27322.0%12 of 12
20141,054,42023.2%12 of 12
2015937,89120.6%12 of 12
20161,340,85029.4%12 of 12
2017877,67719.3%12 of 12
20181,156,14227.8%11 of 12
20191,707,64537.5%12 of 12
20201,291,29828.3%12 of 12
2021869,26419.1%12 of 12
20221,142,55525.1%12 of 12
20231,294,62428.5%12 of 12
20241,745,493Not reported12 of 12
20251,792,03146.1%12 of 12
2026 (provisional, partial year)936,30741.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2022

749,868

US short tons. 2021: 588,857

SO₂, 2022

4

US short tons

NOx, 2022

692

US short tons

CO₂ per MWh, calculated

0.66 t

About 1,313 lb per MWh

4 of 4 EPA units reported CO₂ in 2022 (121B, 122B, 123T, 124T), matched to EIA plant 2454 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

707

million gallons

Consumption, 2024

707

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Severe · 0.899

USGS SUI, HUC12 Town of Monument

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Steam Turbine190.4January 1965
3Natural Gas Fired Combustion Turbine126.9May 1998
4Natural Gas Fired Combustion Turbine126.9May 1998

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southwestern Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cunningham and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cunningham

More plants operated by Southwestern Public Service Co

Questions about Cunningham

How much power does Cunningham produce?

Cunningham reported 1,792,031 MWh (1.79 TWh) of net generation in 2025, a 46.1% capacity factor on 444.2 MW of nameplate capacity. From January to July 2026 it reported 936 GWh, which is provisional.

Where is Cunningham?

Cunningham is in Lea County, New Mexico, at 32.7131, −103.3533. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Cunningham?

EIA-860M for August 2026 lists Southwestern Public Service Co as the operator (EIA operator ID 17718). The operator is not always the owner.

When did Cunningham start operating?

Its first generator began operating in January 1965, according to EIA-860M.

Does InfraMap have power prices for Cunningham?

Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Cunningham, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page