Natural gasBattery storageOperatingCAISO

Dynegy Moss Landing Power Plant Hybrid

Natural gas and battery storage project in Monterey County, California. 1,848 MW of nameplate capacity across 8 generators, operated by Dynegy -Moss Landing LLC.

Also known as Moss Landing Power Plant · EIA plant 260

This project groups Dynegy Moss Landing Power Plant Hybrid (EIA 260). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Monterey Regional Wat…Marina Landfill GasMonterey One WaterAmeresco Santa Cruz EnergyGraniterock QuarryTLR000 Hansen Fuel CellDynegy Moss Landing P…10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
1,848 MWNatural gas 1,398.0 · Battery storage 450.0
Generators
8 operatingEIA-860M, August 2026
Operating since
July 2002First generator online
Operator
Dynegy -Moss Landing LLCEIA operator ID 54802
Grid
CAISOBalancing authority CISO
Price nodes
6 CAISO nodesResource nodes with prices
Location
Monterey County, CA36.8048, −121.7822
EIA plant ID
260EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Dynegy Moss Landing Power Plant Hybrid produces

Free · EIA-923

Net generation, 2025

2.07 TWh

2,068,002 MWh, final

Capacity factor, 2025

Not reported

2024: 32.8%

January to July 2026

1.39 TWh

Provisional

Range, 2016 to 2025

2.1–5.3

TWh a year. Low 2025, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,815,697Not reported12 of 12
20018,472,809Not reported12 of 12
20026,540,840Not reported12 of 12
20036,046,943Not reported10 of 12
20046,440,119Not reported12 of 12
20055,331,135Not reported12 of 12
20066,308,443Not reported12 of 12
20077,551,995Not reported12 of 12
20081,150,515Not reported2 of 12
20094,386,230Not reported12 of 12
20103,546,34514.4%12 of 12
20111,999,1888.1%12 of 12
20125,021,61520.4%12 of 12
20135,044,610Not reported12 of 12
20144,152,56516.9%12 of 12
20153,839,38116.9%11 of 12
20162,584,93610.7%12 of 12
20172,344,63819.1%12 of 12
20184,178,78234.1%12 of 12
20195,220,83342.6%12 of 12
20205,223,03242.5%12 of 12
20213,641,444Not reported8 of 12
20225,118,43842.2%12 of 12
20235,336,838Not reported12 of 12
20243,931,19832.8%12 of 12
20252,068,002Not reported12 of 12
2026 (provisional, partial year)1,392,95619.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

868,746

US short tons. 2024: 1.65M

SO₂, 2025

5

US short tons

NOx, 2025

88

US short tons

CO₂ per MWh, calculated

0.42 t

About 840 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1A, 2A, 3A, 4A, 6-1, 7-1), matched to EIA plant 260 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

83,509

million gallons

Consumption, 2024

Not reported

million gallons

Source

Moss Landing Harbor

Surface, Saline. Once-through

Watershed stress

High · 0.634

USGS SUI, HUC12 Elkhorn Slough

24 of 24 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BAT2Batteries100.0May 2021
BAT3Batteries350.0June 2023
CT1ANatural Gas Fired Combined Cycle233.0July 2002
CT1BNatural Gas Fired Combined Cycle233.0July 2002
CT2ANatural Gas Fired Combined Cycle233.0July 2002
CT2BNatural Gas Fired Combined Cycle233.0July 2002
ST1Natural Gas Fired Combined Cycle233.0July 2002
ST2Natural Gas Fired Combined Cycle233.0July 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dynegy -Moss Landing LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Dynegy Moss Landing Power Plant Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Dynegy Moss Landing Power Plant Hybrid

Questions about Dynegy Moss Landing Power Plant Hybrid

How much power does Dynegy Moss Landing Power Plant Hybrid produce?

Dynegy Moss Landing Power Plant Hybrid reported 2,068,002 MWh (2.07 TWh) of net generation in 2025. From January to July 2026 it reported 1.39 TWh, which is provisional.

Where is Dynegy Moss Landing Power Plant Hybrid?

Dynegy Moss Landing Power Plant Hybrid is in Monterey County, California, at 36.8048, −121.7822. It is in the California Independent System Operator balancing area (CISO).

Who operates Dynegy Moss Landing Power Plant Hybrid?

EIA-860M for August 2026 lists Dynegy -Moss Landing LLC as the operator (EIA operator ID 54802). The operator is not always the owner.

Is Dynegy Moss Landing Power Plant Hybrid a natural gas or a battery storage plant?

Both. Natural gas capacity totals 1,398 MW and battery storage capacity totals 450 MW.

When did Dynegy Moss Landing Power Plant Hybrid start operating?

Its first generator began operating in July 2002, according to EIA-860M.

Does InfraMap have power prices for Dynegy Moss Landing Power Plant Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 6 price nodes linked to Dynegy Moss Landing Power Plant Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page