Petroleum coke and oilOperatingPJM

FirstEnergy Bay Shore

Petroleum coke and oil power plant in Lucas County, Ohio. 187 MW of nameplate capacity across 2 generators, operated by Walleye Power, LLC.

Also known as Bay Shore Generating Facility · EIA plant 2878

Analyst: free account, 1 question a day.

Oregon Clean Energy CenterToledo Ref Power Recovery TrainOwens Corning HeadquartersTemperance Solar, LLCPNA Rossford Solar ArrayFirstEnergy Bay Shore5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
187 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 1955First generator online
Operator
Walleye Power, LLCEIA operator ID 62031
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Lucas County, OH41.6917, −83.4378
EIA plant ID
2878EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power FirstEnergy Bay Shore produces

Free · EIA-923

Net generation, 2025

995 GWh

994,889 MWh, final

Capacity factor, 2025

60.7%

2024: 61.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.9–1.1

TWh a year. Low 2022, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,962,309Not reported12 of 12
20013,178,866Not reported12 of 12
20023,540,926Not reported12 of 12
20033,257,366Not reported11 of 12
20043,434,187Not reported12 of 12
20054,163,010Not reported12 of 12
20064,407,217Not reported12 of 12
2007323,348Not reported1 of 12
20084,185,734Not reported12 of 12
20092,663,208Not reported12 of 12
2010367,49275.4%1 of 12
2011256,14452.5%1 of 12
201297,371Not reported1 of 12
201398,642Not reported1 of 12
2014939,86664.4%12 of 12
20151,088,79974.6%12 of 12
2016Not reportedNot reported0 of 12
20171,037,50871.1%12 of 12
20181,088,07674.6%12 of 12
2019Not reportedNot reported0 of 12
20201,057,39972.3%12 of 12
2021974,21066.8%12 of 12
2022902,679Not reported12 of 12
2023938,34757.3%12 of 12
20241,003,13761.1%12 of 12
2025994,88960.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.47M

US short tons. 2024: 1.39M

SO₂, 2025

2,542

US short tons

NOx, 2025

418

US short tons

CO₂ per MWh, calculated

1.48 t

About 2,951 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 2878 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

63,031

million gallons

Consumption, 2024

Not reported

million gallons

Source

Lake Erie

Surface, Fresh. Once-through

Watershed stress

Moderate · 0.401

USGS SUI, HUC12 Otter Creek-Frontal Lake Erie

12 of 12 cooling months report withdrawal. Great Lakes intake; a shoreline HUC12 does not describe the lake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Coke171.0August 1955
CTPetroleum Liquids16.0August 1967

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Walleye Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query FirstEnergy Bay Shore and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near FirstEnergy Bay Shore

Questions about FirstEnergy Bay Shore

How much power does FirstEnergy Bay Shore produce?

FirstEnergy Bay Shore reported 994,889 MWh (995 GWh) of net generation in 2025, a 60.7% capacity factor on 187 MW of nameplate capacity.

Where is FirstEnergy Bay Shore?

FirstEnergy Bay Shore is in Lucas County, Ohio, at 41.6917, −83.4378. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates FirstEnergy Bay Shore?

EIA-860M for August 2026 lists Walleye Power, LLC as the operator (EIA operator ID 62031). The operator is not always the owner.

When did FirstEnergy Bay Shore start operating?

Its first generator began operating in August 1955, according to EIA-860M.

Does InfraMap have power prices for FirstEnergy Bay Shore?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to FirstEnergy Bay Shore, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page