Natural gasOilOperatingPJM

Oregon Clean Energy Center

Natural gas power plant in Lucas County, Ohio. 1,061.5 MW of nameplate capacity across 4 generators, operated by Oregon Clean Energy Center.

Also known as EIA plant 59764

Analyst: free account, 1 question a day.

FirstEnergy Bay ShoreToledo Ref Power Recovery TrainOwens Corning HeadquartersPNA Rossford Solar ArrayTemperance Solar, LLCOregon Clean5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
1,061.5 MWNatural gas 1,060.0 · Oil 1.5
Generators
4 operatingEIA-860M, August 2026
Operating since
July 2017First generator online
Operator
Oregon Clean Energy CenterEIA operator ID 59534
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
Lucas County, OH41.6679, −83.4437
EIA plant ID
59764EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Oregon Clean produces

Free · EIA-923

Net generation, 2025

5.61 TWh

5,609,595 MWh, final

Capacity factor, 2025

60.3%

2024: 67.8%

January to July 2026

3.46 TWh

Provisional

Range, 2018 to 2025

4.5–6.5

TWh a year. Low 2018, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
20172,561,872Not reported6 of 12
20184,540,01548.8%12 of 12
20195,492,86059.1%12 of 12
20205,663,84760.7%12 of 12
20215,993,11864.5%12 of 12
20225,660,71260.9%12 of 12
20236,505,10070.0%12 of 12
20246,321,09067.8%12 of 12
20255,609,59560.3%12 of 12
2026 (provisional, partial year)3,457,38664.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

2.24M

US short tons. 2024: 2.54M

SO₂, 2025

11

US short tons

NOx, 2025

104

US short tons

CO₂ per MWh, calculated

0.40 t

About 799 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 59764 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,083

million gallons

Consumption, 2024

1,017

million gallons

Source

City of Oregon Ohio

Surface, Fresh. Induced-draft tower

Watershed stress

Moderate · 0.401

USGS SUI, HUC12 Otter Creek-Frontal Lake Erie

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG11Natural Gas Fired Combined Cycle328.0July 2017
CTG12Natural Gas Fired Combined Cycle328.0July 2017
EDG13Petroleum Liquids1.5July 2017
STG10Natural Gas Fired Combined Cycle404.0July 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oregon Clean Energy Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Oregon Clean Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Oregon Clean

Questions about Oregon Clean

How much power does Oregon Clean Energy Center produce?

Oregon Clean Energy Center reported 5,609,595 MWh (5.61 TWh) of net generation in 2025, a 60.3% capacity factor on 1,061.5 MW of nameplate capacity. From January to July 2026 it reported 3.46 TWh, which is provisional.

Where is Oregon Clean Energy Center?

Oregon Clean Energy Center is in Lucas County, Ohio, at 41.6679, −83.4437. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Oregon Clean Energy Center?

EIA-860M for August 2026 lists Oregon Clean Energy Center as the operator (EIA operator ID 59534). The operator is not always the owner.

When did Oregon Clean Energy Center start operating?

Its first generator began operating in July 2017, according to EIA-860M.

Does InfraMap have power prices for Oregon Clean Energy Center?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Oregon Clean Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page