CoalNatural gasOperatingPJM

Orrville

Coal and natural gas power plant in Wayne County, Ohio. 72 MW of nameplate capacity across 3 generators, operated by City of Orrville - (OH).

Also known as EIA plant 2935

Analyst: free account, 1 question a day.

Morton Salt RittmanDG AMP Rittman RdDG AMP 1048 WadsworthWadsworth HBS RTO BTMOrrville10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
72 MWCoal 47.0 · Natural gas 25.0
Generators
3 operatingEIA-860M, August 2026
Operating since
January 1961First generator online
Operator
City of Orrville - (OH)EIA operator ID 14194
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Wayne County, OH40.8510, −81.7658
EIA plant ID
2935EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Orrville produces

Free · EIA-923

Net generation, 2025

29.3 GWh

29,306 MWh, final

Capacity factor, 2025

4.0%

2024: 2.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

10.6–221.1

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000307,581Not reported12 of 12
2001287,669Not reported12 of 12
2002267,144Not reported12 of 12
2003290,931Not reported12 of 12
2004331,330Not reported12 of 12
2005332,240Not reported12 of 12
2006325,774Not reported12 of 12
2007361,936Not reported12 of 12
2008362,938Not reported12 of 12
2009301,361Not reported12 of 12
2010337,65645.6%12 of 12
2011297,90440.2%12 of 12
2012196,33026.5%12 of 12
2013207,72628.1%12 of 12
2014261,63335.3%12 of 12
2015221,08729.9%12 of 12
2016185,51325.0%12 of 12
201780,760Not reported12 of 12
201831,2104.2%12 of 12
201914,8312.0%12 of 12
202029,1873.9%12 of 12
202127,3033.7%12 of 12
202229,5114.0%12 of 12
202310,6231.4%12 of 12
202419,5942.6%12 of 12
202529,3064.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
9Conventional Steam Coal22.0January 1961
10Conventional Steam Coal25.0January 1971
11Natural Gas Steam Turbine25.0January 1971

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Orrville - (OH) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Orrville and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Orrville

Questions about Orrville

How much power does Orrville produce?

Orrville reported 29,306 MWh (29.3 GWh) of net generation in 2025, a 4.0% capacity factor on 72 MW of nameplate capacity.

Where is Orrville?

Orrville is in Wayne County, Ohio, at 40.8510, −81.7658. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Orrville?

EIA-860M for August 2026 lists City of Orrville - (OH) as the operator (EIA operator ID 14194). The operator is not always the owner.

Is Orrville a coal or a natural gas plant?

Both. Coal capacity totals 47 MW and natural gas capacity totals 25 MW.

When did Orrville start operating?

Its first generator began operating in January 1961, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page