Northeastern
Natural gas and coal power plant in Rogers County, Oklahoma. 1,477.5 MW of nameplate capacity across 6 generators, operated by Public Service Co of Oklahoma.
Also known as Northeastern Power Station · EIA plant 2963
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,477.5 MWNatural gas 1,000.0 · Coal 473.0 · Oil 4.5
- Generators
- 6 operatingEIA-860M, August 2026
- Operating since
- April 1961First generator online
- Operator
- Public Service Co of OklahomaEIA operator ID 15474
- Grid
- SPPBalancing authority SWPP
- Price nodes
- 3 SPP nodesResource nodes with prices
- Location
- Rogers County, OK36.4317, −95.7008
- EIA plant ID
- 2963EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Northeastern produces
Free · EIA-923Net generation, 2025
5.02 TWh
5,015,747 MWh, final
Capacity factor, 2025
38.8%
2024: 32.6%
January to July 2026
1.67 TWh
Provisional
Range, 2015 to 2025
4.2–8.1
TWh a year. Low 2024, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 8,231,581 | Not reported | 12 of 12 |
| 2001 | 8,841,834 | Not reported | 12 of 12 |
| 2002 | 9,623,635 | Not reported | 12 of 12 |
| 2003 | 9,493,888 | Not reported | 12 of 12 |
| 2004 | 8,143,694 | Not reported | 12 of 12 |
| 2005 | 10,287,091 | Not reported | 12 of 12 |
| 2006 | 9,856,633 | Not reported | 12 of 12 |
| 2007 | 9,630,264 | Not reported | 12 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | 4,156,226 | Not reported | 5 of 12 |
| 2010 | 8,851,253 | 56.4% | 11 of 12 |
| 2011 | 10,368,018 | 60.7% | 12 of 12 |
| 2012 | 8,947,158 | 52.2% | 12 of 12 |
| 2013 | 9,353,659 | Not reported | 12 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | 8,097,406 | 47.4% | 12 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 27,214 | 2.5% | 1 of 12 |
| 2021 | 4,809,839 | 37.2% | 12 of 12 |
| 2022 | 4,640,654 | 35.9% | 12 of 12 |
| 2023 | 2,113,204 | 24.5% | 8 of 12 |
| 2024 | 4,228,966 | 32.6% | 12 of 12 |
| 2025 | 5,015,747 | 38.8% | 12 of 12 |
| 2026 (provisional, partial year) | 1,674,686 | 22.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · SPPEmissions
Free · EPA CAMPDCO₂, 2025
3.92M
US short tons. 2024: 3.25M
SO₂, 2025
3,133
US short tons
NOx, 2025
3,032
US short tons
CO₂ per MWh, calculated
0.78 t
About 1,563 lb per MWh
4 of 4 EPA units reported CO₂ in 2025 (3301A, 3301B, 3302, 3313, 3314), matched to EIA plant 2963 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
1,551
million gallons
Consumption, 2024
1,249
million gallons
Source
Verdigris River
Surface, Fresh. Induced-draft tower
Watershed stress
Low · 0.260
USGS SUI, HUC12 Fourmile Creek
12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | 170.0 | April 1961 |
| 1A | Natural Gas Fired Combined Cycle | 178.5 | August 2001 |
| 1B | Natural Gas Fired Combined Cycle | 178.5 | August 2001 |
| 2 | Natural Gas Steam Turbine | 473.0 | May 1970 |
| 3 | Conventional Steam Coal | 473.0 | December 1979 |
| IC1 | Petroleum Liquids | 4.5 | December 1980 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Public Service Co of Oklahoma as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Northeastern and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Northeastern
More plants operated by Public Service Co of Oklahoma
Questions about Northeastern
How much power does Northeastern produce?
Northeastern reported 5,015,747 MWh (5.02 TWh) of net generation in 2025, a 38.8% capacity factor on 1,477.5 MW of nameplate capacity. From January to July 2026 it reported 1.67 TWh, which is provisional.
Where is Northeastern?
Northeastern is in Rogers County, Oklahoma, at 36.4317, −95.7008. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Northeastern?
EIA-860M for August 2026 lists Public Service Co of Oklahoma as the operator (EIA operator ID 15474). The operator is not always the owner.
Is Northeastern a natural gas or a coal plant?
Both. Natural gas capacity totals 1,000 MW and coal capacity totals 473 MW, with 4.5 MW of oil.
When did Northeastern start operating?
Its first generator began operating in April 1961, according to EIA-860M.
Does InfraMap have power prices for Northeastern?
Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Northeastern, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page