Natural gasOperatingPJM

Brunner Island

Natural gas power plant in York County, Pennsylvania. 1,616.1 MW of nameplate capacity across 3 generators, operated by Brunner Island LLC.

Also known as Brunner Island Power Station · EIA plant 3140

Analyst: free account, 1 question a day.

York HavenLancaster County Resource RecoveryHaleon York RDC Solar FacilityYork County Resource RecoveryElizabethtown SolarBrunner Island5 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
1,616.1 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 1961First generator online
Operator
Brunner Island LLCEIA operator ID 15537
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
York County, PA40.0961, −76.6962
EIA plant ID
3140EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Brunner Island produces

Free · EIA-923

Net generation, 2025

4.19 TWh

4,191,478 MWh, final

Capacity factor, 2025

29.6%

2024: 24.0%

January to July 2026

2.40 TWh

Provisional

Range, 2015 to 2025

1.8–4.9

TWh a year. Low 2020, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20008,948,780Not reported12 of 12
20016,412,195Not reported12 of 12
20029,995,287Not reported12 of 12
20038,940,575Not reported12 of 12
200410,421,732Not reported12 of 12
200510,167,210Not reported12 of 12
20069,132,954Not reported12 of 12
200710,450,844Not reported12 of 12
20089,284,766Not reported11 of 12
20091,797,369Not reported2 of 12
2010970,78483.3%1 of 12
20111,609,81270.2%2 of 12
20125,961,17743.3%12 of 12
2013356,414Not reported1 of 12
20145,944,39341.8%12 of 12
20154,850,83434.1%12 of 12
20163,267,176Not reported12 of 12
20173,649,475Not reported12 of 12
20181,853,300Not reported12 of 12
20192,587,597Not reported12 of 12
20201,840,170Not reported12 of 12
20212,518,536Not reported12 of 12
20223,672,788Not reported12 of 12
20232,684,89319.0%12 of 12
20243,400,28924.0%12 of 12
20254,191,47829.6%12 of 12
2026 (provisional, partial year)2,400,39829.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

3.27M

US short tons. 2024: 2.35M

SO₂, 2025

3,394

US short tons

NOx, 2025

3,746

US short tons

CO₂ per MWh, calculated

0.78 t

About 1,560 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 3140 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

149,440

million gallons

Consumption, 2024

1,790

million gallons

Source

Susquehanna River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.125

USGS SUI, HUC12 Hartman Run-Susquehanna River

36 of 36 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine363.3May 1961
2Natural Gas Steam Turbine405.0September 1965
3Natural Gas Steam Turbine847.8June 1969

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brunner Island LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Brunner Island and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Brunner Island

Questions about Brunner Island

How much power does Brunner Island produce?

Brunner Island reported 4,191,478 MWh (4.19 TWh) of net generation in 2025, a 29.6% capacity factor on 1,616.1 MW of nameplate capacity. From January to July 2026 it reported 2.40 TWh, which is provisional.

Where is Brunner Island?

Brunner Island is in York County, Pennsylvania, at 40.0961, −76.6962. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Brunner Island?

EIA-860M for August 2026 lists Brunner Island LLC as the operator (EIA operator ID 15537). The operator is not always the owner.

When did Brunner Island start operating?

Its first generator began operating in May 1961, according to EIA-860M.

Does InfraMap have power prices for Brunner Island?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Brunner Island, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page