NuclearOperatingDUK

Oconee

Nuclear power plant in Oconee County, South Carolina. 2,666.7 MW of nameplate capacity across 3 generators, operated by Duke Energy Carolinas, LLC.

Also known as Oconee Nuclear Station · EIA plant 3265

Analyst: free account, 1 question a day.

Seneca City ofDuke Energy CHP at Cl…JocasseeValeniteOconee10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
2,666.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 1973First generator online
Operator
Duke Energy Carolinas, LLCEIA operator ID 5416
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Oconee County, SC34.7939, −82.8986
EIA plant ID
3265EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Oconee produces

Free · EIA-923

Net generation, 2025

22.4 TWh

22,420,221 MWh, final

Capacity factor, 2025

Not reported

2024: 92.6%

January to July 2026

13.0 TWh

Provisional

Range, 2015 to 2025

21.1–22.4

TWh a year. Low 2022, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200020,386,294Not reported12 of 12
200119,040,496Not reported12 of 12
200220,685,092Not reported12 of 12
200319,128,731Not reported12 of 12
200418,667,495Not reported12 of 12
200520,621,576Not reported12 of 12
200619,919,098Not reported12 of 12
200720,564,650Not reported12 of 12
200820,181,101Not reported12 of 12
200920,892,237Not reported12 of 12
201020,943,02589.7%12 of 12
201120,333,96587.0%12 of 12
201220,647,48088.1%12 of 12
201321,021,24490.0%12 of 12
201421,193,38190.7%12 of 12
201521,939,74093.9%12 of 12
201621,177,10390.4%12 of 12
201721,798,74493.3%12 of 12
201821,294,24591.2%12 of 12
201921,884,68193.7%12 of 12
202021,542,26792.0%12 of 12
202122,206,46395.1%12 of 12
202221,125,12990.4%12 of 12
202322,246,73595.2%12 of 12
202421,698,34292.6%12 of 12
202522,420,221Not reported12 of 12
2026 (provisional, partial year)12,985,01795.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

976,533

million gallons

Consumption, 2024

0

million gallons

Source

Lake Keowee

Surface, Fresh. Once-through

Watershed stress

Low · 0.201

USGS SUI, HUC12 Outlet Keowee River

36 of 36 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear886.7July 1973
2Nuclear886.7September 1974
3Nuclear893.3December 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Carolinas, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Oconee and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Oconee

More plants operated by Duke Energy Carolinas, LLC

Questions about Oconee

How much power does Oconee produce?

Oconee reported 22,420,221 MWh (22.4 TWh) of net generation in 2025. From January to July 2026 it reported 13.0 TWh, which is provisional.

Where is Oconee?

Oconee is in Oconee County, South Carolina, at 34.7939, −82.8986. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates Oconee?

EIA-860M for August 2026 lists Duke Energy Carolinas, LLC as the operator (EIA operator ID 5416). The operator is not always the owner.

When did Oconee start operating?

Its first generator began operating in July 1973, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page