Natural gasOperatingDUK

Lincoln Combustion

Natural gas power plant in Lincoln County, North Carolina. 2,155.6 MW of nameplate capacity across 17 generators, operated by Duke Energy Carolinas, LLC.

Also known as Lincoln Combustion Turbine Station · EIA plant 7277

Analyst: free account, 1 question a day.

McGuireMariposa Solar Center LLCMountain IslandGaston County Renewable Energy CenterLincoln Combustion5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
2,155.6 MWNameplate
Generators
17 operatingEIA-860M, August 2026
Operating since
May 1995First generator online
Operator
Duke Energy Carolinas, LLCEIA operator ID 5416
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Lincoln County, NC35.4317, −81.0347
EIA plant ID
7277EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lincoln Combustion produces

Free · EIA-923

Net generation, 2025

958 GWh

957,898 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

504 GWh

Provisional

Range, 2015 to 2025

3.8–957.9

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000446,866Not reported12 of 12
2001141,881Not reported12 of 12
200287,004Not reported12 of 12
200371,457Not reported12 of 12
200460,377Not reported12 of 12
200524,543Not reported12 of 12
2006125,882Not reported12 of 12
2007161,947Not reported12 of 12
2008Not reportedNot reported0 of 12
20095,268Not reported12 of 12
201072,6810.5%12 of 12
2011140,3430.9%12 of 12
201228,5060.2%12 of 12
201358,4330.4%12 of 12
201470,3860.5%12 of 12
201548,6180.3%12 of 12
201646,1120.3%12 of 12
201717,6030.1%12 of 12
201882,4840.5%12 of 12
201924,5050.2%12 of 12
202015,7670.1%12 of 12
202127,5260.2%11 of 12
202248,7450.3%12 of 12
20234,1500.0%12 of 12
20243,843Not reported12 of 12
2025957,898Not reported12 of 12
2026 (provisional, partial year)503,535Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

555,587

US short tons. 2024: 77,422

SO₂, 2025

0

US short tons

NOx, 2025

58

US short tons

CO₂ per MWh, calculated

0.58 t

About 1,160 lb per MWh

17 of 17 EPA units reported CO₂ in 2025 (1, 10, 11, 12, 13, 14, 15, 16, and others), matched to EIA plant 7277 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine109.6May 1995
2Natural Gas Fired Combustion Turbine109.6May 1995
3Natural Gas Fired Combustion Turbine109.6June 1995
4Natural Gas Fired Combustion Turbine109.6June 1995
5Natural Gas Fired Combustion Turbine109.6July 1995
6Natural Gas Fired Combustion Turbine109.6July 1995
7Natural Gas Fired Combustion Turbine109.6September 1995
8Natural Gas Fired Combustion Turbine109.6September 1995
9Natural Gas Fired Combustion Turbine109.6November 1995
10Natural Gas Fired Combustion Turbine109.6November 1995
11Natural Gas Fired Combustion Turbine109.6December 1995
12Natural Gas Fired Combustion Turbine109.6December 1995
13Natural Gas Fired Combustion Turbine109.6February 1996
14Natural Gas Fired Combustion Turbine109.6February 1996
15Natural Gas Fired Combustion Turbine109.6March 1996
16Natural Gas Fired Combustion Turbine109.6March 1996
17Natural Gas Fired Combustion Turbine402.0December 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Carolinas, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lincoln Combustion and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lincoln Combustion

More plants operated by Duke Energy Carolinas, LLC

Questions about Lincoln Combustion

How much power does Lincoln Combustion produce?

Lincoln Combustion reported 957,898 MWh (958 GWh) of net generation in 2025. From January to July 2026 it reported 504 GWh, which is provisional.

Where is Lincoln Combustion?

Lincoln Combustion is in Lincoln County, North Carolina, at 35.4317, −81.0347. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates Lincoln Combustion?

EIA-860M for August 2026 lists Duke Energy Carolinas, LLC as the operator (EIA operator ID 5416). The operator is not always the owner.

When did Lincoln Combustion start operating?

Its first generator began operating in May 1995, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page