OilOperatingSC

Myrtle Beach

Oil power plant in Horry County, South Carolina. 111.5 MW of nameplate capacity across 5 generators, operated by South Carolina Public Service Authority.

Also known as Myrtle Beach Peaking Plant · EIA plant 3320

Analyst: free account, 1 question a day.

Horry Land Fill Gas SiteLandrace Holdings, LLCBeckwith SolarCherry Blossom Solar…Myrtle Beach25 km
Open in the map
6 plants within 50 km, from EIA coordinates.

Key facts

Capacity
111.5 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
May 1962First generator online
Operator
South Carolina Public Service AuthorityEIA operator ID 17543
Grid
SCBalancing authority SC
Price nodes
None linkedNo verified ISO node
Location
Horry County, SC33.7083, −78.9241
EIA plant ID
3320EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Myrtle Beach produces

Free · EIA-923

Net generation, 2025

−453 MWh

−453 MWh, final

Capacity factor, 2025

-0.0%

2024: -0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.9–1.9

GWh a year. Low 2016, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200013,819Not reported12 of 12
20015,020Not reported12 of 12
20023,015Not reported12 of 12
2003544Not reported2 of 12
2004760Not reported12 of 12
20053,857Not reported12 of 12
20063,002Not reported12 of 12
2007958Not reported12 of 12
2008388Not reported12 of 12
20090Not reported12 of 12
20108750.1%12 of 12
201100.0%12 of 12
2012−666-0.1%12 of 12
2013−851-0.1%12 of 12
20149630.1%12 of 12
20151230.0%12 of 12
2016−929-0.1%12 of 12
20175460.1%12 of 12
20186670.1%12 of 12
2019−826-0.1%12 of 12
2020−574-0.1%12 of 12
2021−423-0.0%12 of 12
20221,8930.2%12 of 12
2023−706-0.1%12 of 12
2024−44-0.0%12 of 12
2025−453-0.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2012

Not reported

US short tons. 2011: Not reported

SO₂, 2012

2

US short tons

NOx, 2012

4

US short tons

0 of 3 EPA units reported CO₂ in 2012 (CT3, CT4, CT5), matched to EIA plant 3320 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids11.5August 1972
2Petroleum Liquids11.5May 1962
3Petroleum Liquids26.6May 1962
4Petroleum Liquids26.6August 1972
5Petroleum Liquids35.3June 1976

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists South Carolina Public Service Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Myrtle Beach and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Myrtle Beach

More plants operated by South Carolina Public Service Authority

Questions about Myrtle Beach

How much power does Myrtle Beach produce?

Myrtle Beach reported −453 MWh (−453 MWh) of net generation in 2025.

Where is Myrtle Beach?

Myrtle Beach is in Horry County, South Carolina, at 33.7083, −78.9242. It is in the South Carolina Public Service Authority balancing area (SC).

Who operates Myrtle Beach?

EIA-860M for August 2026 lists South Carolina Public Service Authority as the operator (EIA operator ID 17543). The operator is not always the owner.

When did Myrtle Beach start operating?

Its first generator began operating in May 1962, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page