OilOperatingSC

Hilton Head

Oil power plant in Beaufort County, South Carolina. 117.9 MW of nameplate capacity across 3 generators, operated by South Carolina Public Service Authority.

Also known as Hilton Head Power Plant · EIA plant 3318

Analyst: free account, 1 question a day.

MCRD Parris Island PV HybridTrask East SolarSeabrook SolarSCE&G Nimitz CSGInternational Paper Savanna MillHilton Head25 km
Open in the map
6 plants within 42 km, from EIA coordinates.

Key facts

Capacity
117.9 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
August 1973First generator online
Operator
South Carolina Public Service AuthorityEIA operator ID 17543
Grid
SCBalancing authority SC
Price nodes
None linkedNo verified ISO node
Location
Beaufort County, SC32.2089, −80.6988
EIA plant ID
3318EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hilton Head produces

Free · EIA-923

Net generation, 2025

79 MWh

79 MWh, final

Capacity factor, 2025

0.0%

2024: 0.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.3–4.2

GWh a year. Low 2016, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200018,771Not reported12 of 12
20016,567Not reported12 of 12
20023,972Not reported12 of 12
20036,104Not reported10 of 12
20041,511Not reported12 of 12
20051,205Not reported12 of 12
2006345Not reported12 of 12
2007396Not reported12 of 12
2008391Not reported12 of 12
2009287Not reported12 of 12
20104360.0%12 of 12
201150.0%12 of 12
2012650.0%12 of 12
2013−152-0.0%12 of 12
20142,6320.3%12 of 12
20153160.0%12 of 12
2016−302-0.0%12 of 12
2017310.0%12 of 12
20188600.1%12 of 12
20191960.0%12 of 12
2020740.0%12 of 12
2021−20-0.0%12 of 12
20224,2110.4%12 of 12
2023−28-0.0%12 of 12
20247000.1%12 of 12
2025790.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

4

US short tons

NOx, 2025

10

US short tons

0 of 3 EPA units reported CO₂ in 2025 (CT1, CT2, CT3), matched to EIA plant 3318 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids26.6August 1973
2Petroleum Liquids26.6August 1974
3Petroleum Liquids64.7April 1979

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists South Carolina Public Service Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hilton Head and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hilton Head

More plants operated by South Carolina Public Service Authority

Questions about Hilton Head

How much power does Hilton Head produce?

Hilton Head reported 79 MWh (79 MWh) of net generation in 2025, a 0.0% capacity factor on 117.9 MW of nameplate capacity.

Where is Hilton Head?

Hilton Head is in Beaufort County, South Carolina, at 32.2089, −80.6988. It is in the South Carolina Public Service Authority balancing area (SC).

Who operates Hilton Head?

EIA-860M for August 2026 lists South Carolina Public Service Authority as the operator (EIA operator ID 17543). The operator is not always the owner.

When did Hilton Head start operating?

Its first generator began operating in August 1973, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page