Natural gasOperatingTVA

John Sevier

Natural gas power plant in Hawkins County, Tennessee. 996.9 MW of nameplate capacity across 4 generators, operated by Tennessee Valley Authority.

Also known as John Sevier Combined Cycle Plant · EIA plant 3405

Analyst: free account, 1 question a day.

SR Albany, LLCPowell ValleySR Greenville ISR Greenville IISR Washington I, LLCSR White Pine, LLCJohn Sevier20 km
Open in the map
6 plants within 40 km, from EIA coordinates.

Key facts

Capacity
996.9 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
April 2012First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Hawkins County, TN36.3767, −82.9639
EIA plant ID
3405EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power John Sevier produces

Free · EIA-923

Net generation, 2025

4.75 TWh

4,749,871 MWh, final

Capacity factor, 2025

54.4%

2024: 46.7%

January to July 2026

2.30 TWh

Provisional

Range, 2016 to 2025

4.0–5.4

TWh a year. Low 2021, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,193,401Not reported12 of 12
20015,148,939Not reported12 of 12
20024,880,298Not reported12 of 12
20035,088,376Not reported12 of 12
20044,969,293Not reported12 of 12
20054,960,616Not reported12 of 12
20065,043,577Not reported12 of 12
20074,804,251Not reported12 of 12
20084,841,890Not reported12 of 12
20093,609,040Not reported12 of 12
20103,840,43054.8%12 of 12
201117,0252.9%1 of 12
2012Not reportedNot reported0 of 12
20131,302,599Not reported8 of 12
2014365,9399.1%4 of 12
20154,303,49053.9%11 of 12
20165,429,70462.0%12 of 12
20175,199,09259.5%12 of 12
20184,786,94954.8%12 of 12
20194,954,09056.7%12 of 12
20205,016,43357.3%12 of 12
20214,015,83146.0%12 of 12
20224,449,21650.9%12 of 12
20234,280,54349.0%12 of 12
20244,092,92646.7%12 of 12
20254,749,87154.4%12 of 12
2026 (provisional, partial year)2,296,12345.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.08M

US short tons. 2024: 1.81M

SO₂, 2025

11

US short tons

NOx, 2025

176

US short tons

CO₂ per MWh, calculated

0.44 t

About 876 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3, 4, JCC1, JCC2, JCC3), matched to EIA plant 3405 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

906

million gallons

Consumption, 2024

825

million gallons

Source

Holston River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.121

USGS SUI, HUC12 Dodson Creek-Cherokee Lake

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle191.3April 2012
CTG2Natural Gas Fired Combined Cycle191.3April 2012
CTG3Natural Gas Fired Combined Cycle191.3April 2012
STG1Natural Gas Fired Combined Cycle423.0April 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query John Sevier and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near John Sevier

More plants operated by Tennessee Valley Authority

Questions about John Sevier

How much power does John Sevier produce?

John Sevier reported 4,749,871 MWh (4.75 TWh) of net generation in 2025, a 54.4% capacity factor on 996.9 MW of nameplate capacity. From January to July 2026 it reported 2.30 TWh, which is provisional.

Where is John Sevier?

John Sevier is in Hawkins County, Tennessee, at 36.3767, −82.9639. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates John Sevier?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did John Sevier start operating?

Its first generator began operating in April 2012, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page