HydroOperatingTVA

Watauga

Hydro power plant in Carter County, Tennessee. 57.6 MW of nameplate capacity across 2 generators, operated by Tennessee Valley Authority.

Also known as Watauga Powerhouse · EIA plant 3418

Analyst: free account, 1 question a day.

South HolstonBoone DamSR GrayWolf Hills EnergySR JonesboroughWatauga20 km
Open in the map
6 plants within 37 km, from EIA coordinates.

Key facts

Capacity
57.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 1949First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Carter County, TN36.3413, −82.1264
EIA plant ID
3418EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Watauga produces

Free · EIA-923

Net generation, 2025

94.0 GWh

94,002 MWh, final

Capacity factor, 2025

18.6%

2024: 30.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

77.2–241.2

GWh a year. Low 2017, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200078,143Not reported12 of 12
200186,070Not reported12 of 12
200289,838Not reported12 of 12
2003192,873Not reported12 of 12
2004113,358Not reported12 of 12
2005126,477Not reported12 of 12
2006110,337Not reported12 of 12
200792,241Not reported12 of 12
200860,137Not reported12 of 12
2009113,898Not reported12 of 12
2010108,07121.4%12 of 12
2011127,02825.2%12 of 12
2012129,23225.5%12 of 12
2013232,46846.1%12 of 12
201470,84814.0%12 of 12
2015132,02526.2%12 of 12
201689,92617.8%12 of 12
201777,19615.3%12 of 12
2018180,69835.8%12 of 12
2019173,22834.3%12 of 12
2020241,24547.7%12 of 12
2021140,58527.9%12 of 12
2022109,39521.7%12 of 12
2023113,01822.4%12 of 12
2024154,81630.6%12 of 12
202594,00218.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric28.8September 1949
2Conventional Hydroelectric28.8August 1949

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Watauga and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Watauga

More plants operated by Tennessee Valley Authority

Questions about Watauga

How much power does Watauga produce?

Watauga reported 94,002 MWh (94.0 GWh) of net generation in 2025, a 18.6% capacity factor on 57.6 MW of nameplate capacity.

Where is Watauga?

Watauga is in Carter County, Tennessee, at 36.3413, −82.1264. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Watauga?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did Watauga start operating?

Its first generator began operating in August 1949, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page