CoalOperatingPJM

FirstEnergy Harrison Power Station

Coal power plant in Harrison County, West Virginia. 2,052 MW of nameplate capacity across 3 generators, operated by Monongahela Power Co.

Also known as Harrison Power Station · EIA plant 3944

Analyst: free account, 1 question a day.

Grant Town Power PlantRivesville SolarLongview Power PlantFirstEnergy Harrison25 km
Open in the map
6 plants within 55 km, from EIA coordinates.

Key facts

Capacity
2,052 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 1972First generator online
Operator
Monongahela Power CoEIA operator ID 12796
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
Harrison County, WV39.3842, −80.3325
EIA plant ID
3944EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power FirstEnergy Harrison produces

Free · EIA-923

Net generation, 2025

10.8 TWh

10,755,095 MWh, final

Capacity factor, 2025

Not reported

2024: 58.9%

January to July 2026

6.78 TWh

Provisional

Range, 2015 to 2025

10.6–13.3

TWh a year. Low 2024, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200013,542,618Not reported12 of 12
200112,681,820Not reported12 of 12
200212,927,422Not reported12 of 12
200311,822,351Not reported12 of 12
200413,584,254Not reported12 of 12
200513,212,140Not reported12 of 12
200613,773,139Not reported12 of 12
200713,796,514Not reported12 of 12
20089,080,769Not reported8 of 12
20094,919,274Not reported5 of 12
201012,584,30770.0%12 of 12
20115,260,49759.0%6 of 12
2012Not reportedNot reported0 of 12
201312,706,89270.7%12 of 12
20148,121,72367.3%8 of 12
201511,269,95562.7%12 of 12
201612,890,17271.5%12 of 12
201713,043,03472.6%12 of 12
201813,251,01273.7%12 of 12
201912,894,20571.7%12 of 12
202010,879,715Not reported12 of 12
20211,098,62679.7%1 of 12
202212,058,13767.1%12 of 12
202311,192,67162.3%12 of 12
202410,618,15258.9%12 of 12
202510,755,095Not reported12 of 12
2026 (provisional, partial year)6,782,198Not reported7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

11.50M

US short tons. 2024: 10.98M

SO₂, 2025

18,622

US short tons

NOx, 2025

5,247

US short tons

CO₂ per MWh, calculated

1.07 t

About 2,139 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 3944 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

7,343

million gallons

Consumption, 2024

3,363

million gallons

Source

West Fork River

Surface, Fresh. Natural-draft tower

Watershed stress

Very low/none · 0.187

USGS SUI, HUC12 Limestone Run-West Fork River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal684.0December 1972
2Conventional Steam Coal684.0December 1973
3Conventional Steam Coal684.0December 1974

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Monongahela Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query FirstEnergy Harrison Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near FirstEnergy Harrison

More plants operated by Monongahela Power Co

Questions about FirstEnergy Harrison

How much power does FirstEnergy Harrison Power Station produce?

FirstEnergy Harrison Power Station reported 10,755,095 MWh (10.8 TWh) of net generation in 2025. From January to July 2026 it reported 6.78 TWh, which is provisional.

Where is FirstEnergy Harrison Power Station?

FirstEnergy Harrison Power Station is in Harrison County, West Virginia, at 39.3842, −80.3325. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates FirstEnergy Harrison Power Station?

EIA-860M for August 2026 lists Monongahela Power Co as the operator (EIA operator ID 12796). The operator is not always the owner.

When did FirstEnergy Harrison Power Station start operating?

Its first generator began operating in December 1972, according to EIA-860M.

Does InfraMap have power prices for FirstEnergy Harrison Power Station?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to FirstEnergy Harrison Power Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page