HydroOperatingBANC

Camino

Hydro power plant in El Dorado County, California. 157.8 MW of nameplate capacity across 2 generators, operated by Sacramento Municipal Util Dist.

Also known as Camino Powerhouse · EIA plant 430

Analyst: free account, 1 question a day.

El DoradoUnion ValleyJones ForkRobbs PeakCamino10 km
Open in the map
5 plants within 16 km, from EIA coordinates.

Key facts

Capacity
157.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
October 1963First generator online
Operator
Sacramento Municipal Util DistEIA operator ID 16534
Grid
BANCBalancing authority BANC
Price nodes
None linkedNo verified ISO node
Location
El Dorado County, CA38.8288, −120.5371
EIA plant ID
430EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Camino produces

Free · EIA-923

Net generation, 2025

312 GWh

312,070 MWh, final

Capacity factor, 2025

22.6%

2024: 19.3%

January to July 2026

178 GWh

Provisional

Range, 2015 to 2025

102.0–481.8

GWh a year. Low 2015, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000429,969Not reported12 of 12
200177,554Not reported12 of 12
2002298,694Not reported12 of 12
2003338,891Not reported12 of 12
2004276,004Not reported12 of 12
2005478,082Not reported12 of 12
2006568,447Not reported12 of 12
2007230,308Not reported12 of 12
2008177,978Not reported12 of 12
2009299,481Not reported12 of 12
2010390,36828.2%12 of 12
2011571,22241.3%12 of 12
2012290,61221.0%12 of 12
2013211,25915.3%12 of 12
2014153,92811.1%12 of 12
2015101,9807.4%12 of 12
2016404,00429.1%12 of 12
2017479,59734.7%12 of 12
2018291,16521.1%12 of 12
2019464,03133.6%12 of 12
2020145,79510.5%12 of 12
2021107,6877.8%12 of 12
2022211,35915.3%12 of 12
2023481,81034.9%12 of 12
2024267,77619.3%12 of 12
2025312,07022.6%12 of 12
2026 (provisional, partial year)177,93922.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
H1Conventional Hydroelectric78.9October 1963
H2Conventional Hydroelectric78.9August 1968

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sacramento Municipal Util Dist as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Camino and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Camino

More plants operated by Sacramento Municipal Util Dist

Questions about Camino

How much power does Camino produce?

Camino reported 312,070 MWh (312 GWh) of net generation in 2025, a 22.6% capacity factor on 157.8 MW of nameplate capacity. From January to July 2026 it reported 178 GWh, which is provisional.

Where is Camino?

Camino is in El Dorado County, California, at 38.8288, −120.5371. It is in the Balancing Authority of Northern California balancing area (BANC).

Who operates Camino?

EIA-860M for August 2026 lists Sacramento Municipal Util Dist as the operator (EIA operator ID 16534). The operator is not always the owner.

When did Camino start operating?

Its first generator began operating in October 1963, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page