Capacity
404 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
November 1936First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Lawrence County, AL34.8069, −87.3819
EIA plant ID
49EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wheeler Dam produces

Free · EIA-923

Net generation, 2025

1.18 TWh

1,183,095 MWh, final

Capacity factor, 2025

33.4%

2024: 33.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.0–2.3

TWh a year. Low 2016, high 2020

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000839,481Not reported12 of 12
20011,087,883Not reported12 of 12
20021,178,804Not reported12 of 12
20031,604,904Not reported12 of 12
20041,473,666Not reported12 of 12
20051,126,078Not reported12 of 12
2006947,130Not reported12 of 12
2007560,686Not reported12 of 12
2008771,249Not reported12 of 12
20091,555,029Not reported12 of 12
20101,096,59131.0%12 of 12
20111,384,48839.1%12 of 12
20121,104,66431.1%12 of 12
20131,863,39252.7%12 of 12
20141,247,29835.2%12 of 12
20151,439,82340.7%12 of 12
20161,014,93528.6%12 of 12
20171,295,64836.6%12 of 12
20181,623,82545.9%12 of 12
20191,630,30046.1%12 of 12
20202,290,04564.5%12 of 12
20211,611,09945.5%12 of 12
20221,373,69838.8%12 of 12
20231,072,65230.3%12 of 12
20241,194,44533.7%12 of 12
20251,183,09533.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric35.1November 1936
2Conventional Hydroelectric35.1April 1937
3Conventional Hydroelectric35.1January 1941
4Conventional Hydroelectric35.1March 1941
5Conventional Hydroelectric35.1October 1948
6Conventional Hydroelectric35.1February 1949
7Conventional Hydroelectric35.1December 1949
8Conventional Hydroelectric35.1March 1950
9Conventional Hydroelectric43.6December 1962
10Conventional Hydroelectric36.0June 1963
11Conventional Hydroelectric43.6December 1963

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wheeler Dam and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wheeler Dam

More plants operated by Tennessee Valley Authority

Questions about Wheeler Dam

How much power does Wheeler Dam produce?

Wheeler Dam reported 1,183,095 MWh (1.18 TWh) of net generation in 2025, a 33.4% capacity factor on 404 MW of nameplate capacity.

Where is Wheeler Dam?

Wheeler Dam is in Lawrence County, Alabama, at 34.8069, −87.3819. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Wheeler Dam?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did Wheeler Dam start operating?

Its first generator began operating in November 1936, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page