HydroOperatingISO-NE

Penacook Lower Falls

Hydro power plant in Merrimack County, New Hampshire. 4.6 MW of nameplate capacity across 1 generator, operated by Briar-Hydro Associates.

Also known as Penacook Lower Falls Power Station · EIA plant 50353

Analyst: free account, 1 question a day.

Garvins FallsEHC West HopkintonClement Dam Hydro LLCPenacook Lower Falls10 km
Open in the map
6 plants within 17 km, from EIA coordinates.

Key facts

Capacity
4.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 1983First generator online
Operator
Briar-Hydro AssociatesEIA operator ID 24793
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Merrimack County, NH43.2858, −71.5950
EIA plant ID
50353EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Penacook Lower Falls produces

Free · EIA-923

Net generation, 2025

16.1 GWh

16,050 MWh, final

Capacity factor, 2025

39.8%

2024: 41.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

14.5–23.5

GWh a year. Low 2016, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200112,040Not reported12 of 12
200216,317Not reported12 of 12
200322,847Not reported12 of 12
200421,017Not reported12 of 12
200523,961Not reported12 of 12
200627,982Not reported12 of 12
200718,277Not reported12 of 12
200826,268Not reported12 of 12
200927,173Not reported12 of 12
201017,12242.5%12 of 12
201127,60868.5%12 of 12
201219,08247.2%12 of 12
201320,19950.1%12 of 12
201424,38860.5%12 of 12
201517,57743.6%12 of 12
201614,52335.9%12 of 12
201722,12454.9%12 of 12
201817,91144.4%12 of 12
201919,01047.2%12 of 12
202016,49440.8%12 of 12
202123,48458.3%12 of 12
202218,58846.1%12 of 12
202322,59756.1%12 of 12
202416,63541.2%12 of 12
202516,05039.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric4.6August 1983

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Briar-Hydro Associates as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Penacook Lower Falls and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Penacook Lower Falls

More plants operated by Briar-Hydro Associates

Questions about Penacook Lower Falls

How much power does Penacook Lower Falls produce?

Penacook Lower Falls reported 16,050 MWh (16.1 GWh) of net generation in 2025, a 39.8% capacity factor on 4.6 MW of nameplate capacity.

Where is Penacook Lower Falls?

Penacook Lower Falls is in Merrimack County, New Hampshire, at 43.2858, −71.5950. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Penacook Lower Falls?

EIA-860M for August 2026 lists Briar-Hydro Associates as the operator (EIA operator ID 24793). The operator is not always the owner.

When did Penacook Lower Falls start operating?

Its first generator began operating in August 1983, according to EIA-860M.

Does InfraMap have power prices for Penacook Lower Falls?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Penacook Lower Falls, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page