Natural gasOilOperatingMISO

Caterpillar

Natural gas and oil power plant in Tippecanoe County, Indiana. 7.3 MW of nameplate capacity across 3 generators, operated by Caterpillar Inc.

Also known as EIA plant 50935

Analyst: free account, 1 question a day.

Sagamore Plant CogenerationPrimientCaterpillar5 km
Open in the map
5 plants within 8.1 km, from EIA coordinates.

Key facts

Capacity
7.3 MWNatural gas 5.5 · Oil 1.8
Generators
3 operatingEIA-860M, August 2026
Operating since
March 1996First generator online
Operator
Caterpillar IncEIA operator ID 3179
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Tippecanoe County, IN40.4175, −86.8447
EIA plant ID
50935EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Caterpillar produces

Free · EIA-923

Net generation, 2025

21.1 GWh

21,095 MWh, final

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

11.6 GWh

Provisional

Range, 2015 to 2025

21.1–40.2

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001145Not reported12 of 12
200210Not reported12 of 12
20030Not reported12 of 12
20040Not reported12 of 12
20050Not reported12 of 12
2006148Not reported12 of 12
2007538Not reported12 of 12
200899Not reported12 of 12
2009185Not reported12 of 12
20103380.9%12 of 12
201120,370Not reported12 of 12
201223,32824.6%12 of 12
201332,209Not reported12 of 12
201437,45732.1%12 of 12
201540,22134.5%12 of 12
201628,34224.3%12 of 12
201733,82629.0%12 of 12
201836,21031.1%12 of 12
201938,16532.8%12 of 12
202033,91429.0%12 of 12
202123,328Not reported12 of 12
202224,449Not reported12 of 12
202327,34126.5%12 of 12
202422,993Not reported12 of 12
202521,095Not reported12 of 12
2026 (provisional, partial year)11,64124.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
516APetroleum Liquids1.8March 1996
ET1-1Natural Gas Internal Combustion Engine3.0March 2022
ET4Natural Gas Internal Combustion Engine2.5April 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Caterpillar Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Caterpillar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Caterpillar

Questions about Caterpillar

How much power does Caterpillar produce?

Caterpillar reported 21,095 MWh (21.1 GWh) of net generation in 2025. From January to July 2026 it reported 11.6 GWh, which is provisional.

Where is Caterpillar?

Caterpillar is in Tippecanoe County, Indiana, at 40.4175, −86.8447. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Caterpillar?

EIA-860M for August 2026 lists Caterpillar Inc as the operator (EIA operator ID 3179). The operator is not always the owner.

Is Caterpillar a natural gas or a oil plant?

Both. Natural gas capacity totals 5.5 MW and oil capacity totals 1.8 MW.

When did Caterpillar start operating?

Its first generator began operating in March 1996, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page