GeothermalOperatingIID

Second Imperial Geothermal

Geothermal power plant in Imperial County, California. 74.5 MW of nameplate capacity across 4 generators, operated by ORCAL Geothermal, Inc.

Also known as Heber 2 Geothermal Plant · EIA plant 54111

Analyst: free account, 1 question a day.

Heber GeothermalMount Signal Solar Farm VImperial Valley Solar, LLCEl Centro HybridSecond Imperial Geoth…5 km
Open in the map
6 plants within 9.8 km, from EIA coordinates.

Key facts

Capacity
74.5 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
January 2006First generator online
Operator
ORCAL Geothermal, IncEIA operator ID 49748
Grid
IIDBalancing authority IID
Price nodes
None linkedNo verified ISO node
Location
Imperial County, CA32.7144, −115.5356
EIA plant ID
54111EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Second Imperial Geothermal produces

Free · EIA-923

Net generation, 2025

275 GWh

275,195 MWh, final

Capacity factor, 2025

42.2%

2024: 46.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

142.8–326.6

GWh a year. Low 2022, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001321,470Not reported12 of 12
2002319,885Not reported12 of 12
2003331,509Not reported12 of 12
2004297,975Not reported12 of 12
2005287,663Not reported12 of 12
2006298,564Not reported12 of 12
2007317,047Not reported12 of 12
2008314,278Not reported12 of 12
2009253,267Not reported12 of 12
2010242,52543.3%12 of 12
2011251,81044.9%12 of 12
2012243,28534.6%12 of 12
2013222,88231.8%12 of 12
2014226,19132.3%12 of 12
2015204,68929.2%12 of 12
2016165,50723.6%12 of 12
2017144,30220.6%12 of 12
2018226,70032.3%12 of 12
2019216,99831.0%12 of 12
2020205,21729.2%12 of 12
2021187,30426.7%12 of 12
2022142,796Not reported12 of 12
2023326,57950.0%12 of 12
2024302,32946.2%12 of 12
2025275,19542.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GE13Geothermal16.0January 2006
GEN14Geothermal16.0April 2008
OEC1Geothermal26.5November 2022
OEC2Geothermal16.0November 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists ORCAL Geothermal, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Second Imperial Geothermal and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Second Imperial Geothermal

More plants operated by ORCAL Geothermal, Inc

Questions about Second Imperial Geothermal

How much power does Second Imperial Geothermal produce?

Second Imperial Geothermal reported 275,195 MWh (275 GWh) of net generation in 2025, a 42.2% capacity factor on 74.5 MW of nameplate capacity.

Where is Second Imperial Geothermal?

Second Imperial Geothermal is in Imperial County, California, at 32.7144, −115.5356. It is in the Imperial Irrigation District balancing area (IID).

Who operates Second Imperial Geothermal?

EIA-860M for August 2026 lists ORCAL Geothermal, Inc as the operator (EIA operator ID 49748). The operator is not always the owner.

When did Second Imperial Geothermal start operating?

Its first generator began operating in January 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page