Natural gasBattery storageOperatingIID

El Centro Hybrid

Natural gas project in Imperial County, California. 388.3 MW of nameplate capacity across 7 generators, operated by Imperial Irrigation District.

Also known as El Centro Power Plant · EIA plant 389

This project groups El Centro Hybrid (EIA 389). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Sol Orchard El Centro PVIVC SolarValencia 3Heber SolarEl Centro Hybrid5 km
Open in the map
6 plants within 10.0 km, from EIA coordinates.

Key facts

Capacity
388.3 MWNatural gas 358.3 · Battery storage 30.0
Generators
7 operatingEIA-860M, August 2026
Operating since
August 1952First generator online
Operator
Imperial Irrigation DistrictEIA operator ID 9216
Grid
IIDBalancing authority IID
Price nodes
None linkedNo verified ISO node
Location
Imperial County, CA32.8022, −115.5400
EIA plant ID
389EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power El Centro Hybrid produces

Free · EIA-923

Net generation, 2025

1.09 TWh

1,089,743 MWh, final

Capacity factor, 2025

34.8%

2024: 33.1%

January to July 2026

419 GWh

Provisional

Range, 2015 to 2025

0.6–1.1

TWh a year. Low 2020, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000690,225Not reported12 of 12
2001492,233Not reported12 of 12
2002421,736Not reported12 of 12
2003489,440Not reported12 of 12
2004510,297Not reported12 of 12
2005552,835Not reported12 of 12
2006442,927Not reported12 of 12
2007431,444Not reported12 of 12
2008508,470Not reported12 of 12
2009522,982Not reported12 of 12
2010578,35025.8%12 of 12
2011771,10242.7%12 of 12
2012912,36743.1%12 of 12
20131,186,126Not reported12 of 12
20141,165,97437.1%12 of 12
2015998,99731.8%12 of 12
2016232,489Not reported3 of 12
20171,044,63133.4%12 of 12
2018750,46324.0%12 of 12
2019638,28020.4%12 of 12
2020633,39020.2%12 of 12
2021952,72730.4%12 of 12
20221,042,26233.3%12 of 12
20231,086,93834.7%12 of 12
20241,038,71233.1%12 of 12
20251,089,74334.8%12 of 12
2026 (provisional, partial year)419,41123.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

548,461

US short tons. 2024: 539,569

SO₂, 2025

3

US short tons

NOx, 2025

92

US short tons

CO₂ per MWh, calculated

0.50 t

About 1,007 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (2-2, 3-1, 3-2, 4), matched to EIA plant 389 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,550

million gallons

Consumption, 2024

1,448

million gallons

Source

Dogwood Canal

Surface, Fresh. Induced-draft tower

Watershed stress

Severe · 1.000

USGS SUI, HUC12 Town of El Centro

24 of 36 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Fired Combined Cycle34.5August 1952
2ANatural Gas Fired Combined Cycle89.9June 1993
4Natural Gas Steam Turbine81.6August 1968
30Natural Gas Fired Combined Cycle65.9October 2012
31Natural Gas Fired Combined Cycle43.2October 2012
32Natural Gas Fired Combined Cycle43.2October 2012
BESSBatteries30.0October 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Imperial Irrigation District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query El Centro Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near El Centro Hybrid

More plants operated by Imperial Irrigation District

Questions about El Centro Hybrid

How much power does El Centro Hybrid produce?

El Centro Hybrid reported 1,089,743 MWh (1.09 TWh) of net generation in 2025, a 34.8% capacity factor on 388.3 MW of nameplate capacity. From January to July 2026 it reported 419 GWh, which is provisional.

Where is El Centro Hybrid?

El Centro Hybrid is in Imperial County, California, at 32.8022, −115.5400. It is in the Imperial Irrigation District balancing area (IID).

Who operates El Centro Hybrid?

EIA-860M for August 2026 lists Imperial Irrigation District as the operator (EIA operator ID 9216). The operator is not always the owner.

When did El Centro Hybrid start operating?

Its first generator began operating in August 1952, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page