Natural gasBattery storageOperatingCAISO

Biola University Hybrid

Natural gas project in Los Angeles County, California. 4.3 MW of nameplate capacity across 4 generators, operated by Biola University.

Also known as EIA plant 54296

This project groups Biola University Hybrid (EIA 54296). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

CA- US Foods- La MiradaBuidling LFreeway SpringsStaples La Mirada, CABiola University Hybrid1 km
Open in the map
6 plants within 2.9 km, from EIA coordinates.

Key facts

Capacity
4.3 MWNatural gas 4.0 · Battery storage 0.3
Generators
4 operatingEIA-860M, August 2026
Operating since
September 2002First generator online
Operator
Biola UniversityEIA operator ID 1752
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA33.9070, −118.0131
EIA plant ID
54296EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Biola University Hybrid produces

Free · EIA-923

Net generation, 2025

13.0 GWh

12,983 MWh, final

Capacity factor, 2025

37.1%

2024: 34.3%

January to July 2026

7.34 GWh

Provisional

Range, 2015 to 2025

7.4–14.8

GWh a year. Low 2022, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20016,539Not reported12 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
200411,523Not reported12 of 12
200512,531Not reported12 of 12
200611,647Not reported12 of 12
200711,231Not reported12 of 12
200814,234Not reported12 of 12
200913,099Not reported12 of 12
201012,22463.4%12 of 12
201112,46764.7%12 of 12
201215,99082.7%12 of 12
201312,58565.3%12 of 12
201412,15463.1%12 of 12
201512,97167.3%12 of 12
201612,88566.7%12 of 12
201714,80076.8%12 of 12
201813,066Not reported11 of 12
201912,57165.2%12 of 12
20209,732Not reported12 of 12
20217,87189.9%12 of 12
20227,418Not reported12 of 12
202311,153Not reported12 of 12
202412,03734.3%12 of 12
202512,98337.1%12 of 12
2026 (provisional, partial year)7,33536.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BATTBatteries0.3February 2018
EG-1HNatural Gas Internal Combustion Engine1.5February 2023
EG-2HNatural Gas Internal Combustion Engine1.5December 2022
EG3Natural Gas Internal Combustion Engine1.0September 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Biola University as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Biola University Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Biola University Hybrid

Questions about Biola University Hybrid

How much power does Biola University Hybrid produce?

Biola University Hybrid reported 12,983 MWh (13.0 GWh) of net generation in 2025, a 37.1% capacity factor on 4.3 MW of nameplate capacity. From January to July 2026 it reported 7.34 GWh, which is provisional.

Where is Biola University Hybrid?

Biola University Hybrid is in Los Angeles County, California, at 33.9070, −118.0131. It is in the California Independent System Operator balancing area (CISO).

Who operates Biola University Hybrid?

EIA-860M for August 2026 lists Biola University as the operator (EIA operator ID 1752). The operator is not always the owner.

When did Biola University Hybrid start operating?

Its first generator began operating in September 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page