HydroOperatingNYISO

Stillwater Hydro Electric Project

Hydro power plant in Saratoga County, New York. 3.4 MW of nameplate capacity across 2 generators, operated by GR Catalyst One, LLC.

Also known as Stillwater Hydroelectric Facility · EIA plant 54395

Analyst: free account, 1 question a day.

NY8 - ELP Stillwater SolarCzub CSGNY - CSG - Ellsworth IINY8 - Branscomb SolarSchaghticokeStillwater Hydro Elec…2 km
Open in the map
6 plants within 6.2 km, from EIA coordinates.

Key facts

Capacity
3.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
April 1993First generator online
Operator
GR Catalyst One, LLCEIA operator ID 59834
Grid
NYISOBalancing authority NYIS
Price nodes
None linkedNo verified ISO node
Location
Saratoga County, NY42.9375, −73.6544
EIA plant ID
54395EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Stillwater Hydro Electric Project produces

Free · EIA-923

Net generation, 2025

9.96 GWh

9,955 MWh, final

Capacity factor, 2025

33.4%

2024: 36.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

10.0–16.1

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20011Not reported12 of 12
20021Not reported12 of 12
20031Not reported12 of 12
200413,993Not reported12 of 12
20052Not reported12 of 12
200616,540Not reported12 of 12
200712,300Not reported12 of 12
20089,468Not reported12 of 12
200915,000Not reported12 of 12
2010140.0%12 of 12
201115,00050.4%12 of 12
201215,00050.2%12 of 12
201315,60052.4%12 of 12
201414,37248.3%12 of 12
201511,44738.4%12 of 12
201613,25544.4%12 of 12
201715,28751.3%12 of 12
201813,93146.8%12 of 12
201913,92646.8%12 of 12
202013,11743.9%12 of 12
202116,13254.2%12 of 12
202212,76642.9%12 of 12
202311,55038.8%12 of 12
202410,85736.4%12 of 12
20259,95533.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric1.7April 1993
2Conventional Hydroelectric1.7April 1993

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists GR Catalyst One, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Stillwater Hydro Electric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Stillwater Hydro Electric Project

Questions about Stillwater Hydro Electric Project

How much power does Stillwater Hydro Electric Project produce?

Stillwater Hydro Electric Project reported 9,955 MWh (9.96 GWh) of net generation in 2025, a 33.4% capacity factor on 3.4 MW of nameplate capacity.

Where is Stillwater Hydro Electric Project?

Stillwater Hydro Electric Project is in Saratoga County, New York, at 42.9375, −73.6544. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Stillwater Hydro Electric Project?

EIA-860M for August 2026 lists GR Catalyst One, LLC as the operator (EIA operator ID 59834). The operator is not always the owner.

When did Stillwater Hydro Electric Project start operating?

Its first generator began operating in April 1993, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page