Natural gasOperatingNYISO

Saranac Facility

Natural gas power plant in Clinton County, New York. 285.6 MW of nameplate capacity across 3 generators, operated by Saranac Power Partners LP.

Also known as Saranac Power Plant · EIA plant 54574

Analyst: free account, 1 question a day.

Route 22 Community So…Lower Saranac Hydroelectric FacilityClinton LFGTE FacilitySaranac Facility5 km
Open in the map
5 plants within 13 km, from EIA coordinates.

Key facts

Capacity
285.6 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 1994First generator online
Operator
Saranac Power Partners LPEIA operator ID 16729
Grid
NYISOBalancing authority NYIS
Price nodes
2 NYISO nodesResource nodes with prices
Location
Clinton County, NY44.7132, −73.4557
EIA plant ID
54574EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Saranac Facility produces

Free · EIA-923

Net generation, 2025

387 GWh

387,014 MWh, final

Capacity factor, 2025

15.5%

2024: 14.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

34.2–387.0

GWh a year. Low 2020, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,968,817Not reported12 of 12
20011,979,755Not reported12 of 12
20022,004,841Not reported12 of 12
20031,976,410Not reported12 of 12
20041,877,211Not reported12 of 12
20051,998,646Not reported12 of 12
20062,047,195Not reported12 of 12
20072,045,050Not reported12 of 12
20082,118,088Not reported12 of 12
20091,182,394Not reported12 of 12
2010401,38716.0%12 of 12
2011378,86015.1%12 of 12
2012453,18818.1%12 of 12
2013485,149Not reported12 of 12
2014224,6319.0%12 of 12
2015185,2777.4%12 of 12
201688,5793.5%12 of 12
201760,2632.4%12 of 12
201870,7842.8%12 of 12
201981,1893.2%12 of 12
202034,2381.4%12 of 12
202147,2891.9%12 of 12
202292,6183.7%12 of 12
2023234,4459.4%12 of 12
2024354,88514.1%12 of 12
2025387,01415.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

205,820

US short tons. 2024: 202,037

SO₂, 2025

1

US short tons

NOx, 2025

43

US short tons

CO₂ per MWh, calculated

0.53 t

About 1,064 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 54574 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle95.2June 1994
GEN2Natural Gas Fired Combined Cycle95.2June 1994
GEN3Natural Gas Fired Combined Cycle95.2June 1994

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Saranac Power Partners LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Saranac Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Saranac Facility

Questions about Saranac Facility

How much power does Saranac Facility produce?

Saranac Facility reported 387,014 MWh (387 GWh) of net generation in 2025, a 15.5% capacity factor on 285.6 MW of nameplate capacity.

Where is Saranac Facility?

Saranac Facility is in Clinton County, New York, at 44.7132, −73.4557. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Saranac Facility?

EIA-860M for August 2026 lists Saranac Power Partners LP as the operator (EIA operator ID 16729). The operator is not always the owner.

When did Saranac Facility start operating?

Its first generator began operating in June 1994, according to EIA-860M.

Does InfraMap have power prices for Saranac Facility?

Yes. InfraMap has NYISO day-ahead and real-time prices at 2 price nodes linked to Saranac Facility, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page