Goal Line LP
Natural gas power plant in San Diego County, California. 51.4 MW of nameplate capacity across 2 generators, operated by Goal Line LP.
Also known as Goal Line Power Plant · EIA plant 54749
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 51.4 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- August 1994First generator online
- Operator
- Goal Line LPEIA operator ID 22269
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 1 CAISO nodeResource nodes with prices
- Location
- San Diego County, CA33.1185, −117.0995
- EIA plant ID
- 54749EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Goal Line LP produces
Free · EIA-923Net generation, 2025
7.40 GWh
7,397 MWh, final
Capacity factor, 2025
1.6%
2024: 2.5%
January to July 2026
6.04 GWh
Provisional
Range, 2015 to 2025
7.4–23.0
GWh a year. Low 2025, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 359,608 | Not reported | 12 of 12 |
| 2001 | 404,568 | Not reported | 12 of 12 |
| 2002 | 408,560 | Not reported | 12 of 12 |
| 2003 | 301,310 | Not reported | 12 of 12 |
| 2004 | 280,678 | Not reported | 12 of 12 |
| 2005 | 243,325 | Not reported | 12 of 12 |
| 2006 | 285,738 | Not reported | 12 of 12 |
| 2007 | 305,655 | Not reported | 12 of 12 |
| 2008 | 322,913 | Not reported | 12 of 12 |
| 2009 | 262,985 | Not reported | 12 of 12 |
| 2010 | 193,642 | 43.0% | 12 of 12 |
| 2011 | 192,193 | 42.7% | 12 of 12 |
| 2012 | 190,913 | 42.3% | 12 of 12 |
| 2013 | 161,084 | Not reported | 12 of 12 |
| 2014 | 165,136 | 36.7% | 12 of 12 |
| 2015 | 22,797 | 5.1% | 12 of 12 |
| 2016 | 22,993 | 5.1% | 12 of 12 |
| 2017 | 22,311 | 5.0% | 12 of 12 |
| 2018 | 18,142 | 4.0% | 12 of 12 |
| 2019 | 8,494 | 1.9% | 12 of 12 |
| 2020 | 18,695 | 4.1% | 12 of 12 |
| 2021 | 17,362 | 3.9% | 12 of 12 |
| 2022 | 10,801 | 2.4% | 12 of 12 |
| 2023 | 13,623 | 3.0% | 12 of 12 |
| 2024 | 11,365 | 2.5% | 12 of 12 |
| 2025 | 7,397 | 1.6% | 12 of 12 |
| 2026 (provisional, partial year) | 6,043 | 2.3% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDCO₂, 2025
4,006
US short tons. 2024: 6,210
SO₂, 2025
0
US short tons
NOx, 2025
0
US short tons
CO₂ per MWh, calculated
0.54 t
About 1,083 lb per MWh
1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 54749 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CTG | Natural Gas Fired Combined Cycle | 41.2 | August 1994 |
| STG | Natural Gas Fired Combined Cycle | 10.2 | August 1994 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Goal Line LP as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Goal Line LP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Goal Line LP
Questions about Goal Line LP
How much power does Goal Line LP produce?
Goal Line LP reported 7,397 MWh (7.40 GWh) of net generation in 2025, a 1.6% capacity factor on 51.4 MW of nameplate capacity. From January to July 2026 it reported 6.04 GWh, which is provisional.
Where is Goal Line LP?
Goal Line LP is in San Diego County, California, at 33.1185, −117.0995. It is in the California Independent System Operator balancing area (CISO).
Who operates Goal Line LP?
EIA-860M for August 2026 lists Goal Line LP as the operator (EIA operator ID 22269). The operator is not always the owner.
When did Goal Line LP start operating?
Its first generator began operating in August 1994, according to EIA-860M.
Does InfraMap have power prices for Goal Line LP?
Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Goal Line LP, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page