Natural gasOperatingERCOT

Bridgeport Gas Processing Plant

Natural gas power plant in Wise County, Texas. 10.4 MW of nameplate capacity across 13 generators, operated by EnLink Midstream Services, LLC.

Also known as EIA plant 55053

Analyst: free account, 1 question a day.

Jack CountyWise County Power LLCKeechi WindConnolly BESSPorter Solar, LLC (TX)WAL5764Bridgeport Gas Proces…25 km
Open in the map
6 plants within 44 km, from EIA coordinates.

Key facts

Capacity
10.4 MWNameplate
Generators
13 operatingEIA-860M, August 2026
Operating since
July 2000First generator online
Operator
EnLink Midstream Services, LLCEIA operator ID 59366
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Wise County, TX33.1958, −97.8025
EIA plant ID
55053EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bridgeport Gas Processing Plant produces

Free · EIA-923

Net generation, 2025

46.6 GWh

46,576 MWh, final

Capacity factor, 2025

51.1%

2024: 52.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

41.3–58.4

GWh a year. Low 2021, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200134,400Not reported12 of 12
200245,600Not reported12 of 12
200342,800Not reported12 of 12
200439,700Not reported12 of 12
200539,008Not reported12 of 12
200639,500Not reported12 of 12
200739,429Not reported12 of 12
200843,828Not reported12 of 12
200949,947Not reported12 of 12
201055,11687.4%12 of 12
201158,14892.2%12 of 12
201200.0%12 of 12
201375,182Not reported12 of 12
201482,54790.6%12 of 12
201558,35264.1%12 of 12
201656,75662.1%12 of 12
201753,08458.3%12 of 12
201852,64057.8%12 of 12
201951,41056.4%12 of 12
202043,92348.1%12 of 12
202141,28545.3%12 of 12
202243,76248.0%12 of 12
202349,61554.5%12 of 12
202447,86152.4%12 of 12
202546,57651.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
14Natural Gas Internal Combustion Engine0.8April 2013
15Natural Gas Internal Combustion Engine0.8April 2013
16Natural Gas Internal Combustion Engine0.8April 2013
17Natural Gas Internal Combustion Engine0.8April 2013
654Natural Gas Internal Combustion Engine0.8July 2000
655Natural Gas Internal Combustion Engine0.8February 2001
656Natural Gas Internal Combustion Engine0.8February 2001
657Natural Gas Internal Combustion Engine0.8April 2001
658Natural Gas Internal Combustion Engine0.8February 2001
666Natural Gas Internal Combustion Engine0.8September 2001
667Natural Gas Internal Combustion Engine0.8September 2001
671Natural Gas Internal Combustion Engine0.8September 2002
2723Natural Gas Internal Combustion Engine0.8December 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EnLink Midstream Services, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bridgeport Gas Processing Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bridgeport Gas Processing Plant

Questions about Bridgeport Gas Processing Plant

How much power does Bridgeport Gas Processing Plant produce?

Bridgeport Gas Processing Plant reported 46,576 MWh (46.6 GWh) of net generation in 2025, a 51.1% capacity factor on 10.4 MW of nameplate capacity.

Where is Bridgeport Gas Processing Plant?

Bridgeport Gas Processing Plant is in Wise County, Texas, at 33.1958, −97.8026. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Bridgeport Gas Processing Plant?

EIA-860M for August 2026 lists EnLink Midstream Services, LLC as the operator (EIA operator ID 59366). The operator is not always the owner.

When did Bridgeport Gas Processing Plant start operating?

Its first generator began operating in July 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page