Natural gasOperatingERCOT

Jack County

Natural gas power plant in Wise County, Texas. 1,280 MW of nameplate capacity across 6 generators, operated by Jack County Power, LLC.

Also known as Jack County Power Station · EIA plant 55230

Analyst: free account, 1 question a day.

Wise County Power LLCBridgeport Gas Processing PlantKeechi WindBarton Chapel Wind FarmMineral Wells East BESSJack County20 km
Open in the map
6 plants within 36 km, from EIA coordinates.

Key facts

Capacity
1,280 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
February 2006First generator online
Operator
Jack County Power, LLCEIA operator ID 66085
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Wise County, TX33.1010, −97.9574
EIA plant ID
55230EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Jack County produces

Free · EIA-923

Net generation, 2025

6.25 TWh

6,251,601 MWh, final

Capacity factor, 2025

55.8%

2024: 60.1%

January to July 2026

1.42 TWh

Provisional

Range, 2015 to 2025

3.2–6.8

TWh a year. Low 2017, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
20063,063,108Not reported11 of 12
20073,566,335Not reported12 of 12
20083,125,963Not reported12 of 12
20093,296,975Not reported12 of 12
20103,128,13855.8%12 of 12
20113,966,698Not reported12 of 12
20125,521,74749.1%12 of 12
20135,432,917Not reported12 of 12
20146,240,76355.7%12 of 12
20156,187,53855.2%12 of 12
20165,347,07347.6%12 of 12
20173,244,87528.9%12 of 12
20183,651,67532.6%12 of 12
20194,066,72436.3%12 of 12
20203,305,05329.4%12 of 12
20213,657,61932.6%12 of 12
20225,486,22348.9%12 of 12
20236,252,13355.8%12 of 12
20246,761,18360.1%12 of 12
20256,251,60155.8%12 of 12
2026 (provisional, partial year)1,423,44921.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.73M

US short tons. 2024: 2.93M

SO₂, 2025

14

US short tons

NOx, 2025

259

US short tons

CO₂ per MWh, calculated

0.44 t

About 873 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (CT-1, CT-2, CT-3, CT-4), matched to EIA plant 55230 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,662

million gallons

Consumption, 2024

1,600

million gallons

Source

Lake Bridgeport

Surface, Fresh. Induced-draft tower

Watershed stress

High · 0.722

USGS SUI, HUC12 Jasper Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combined Cycle170.0February 2006
CT2Natural Gas Fired Combined Cycle170.0February 2006
CT3Natural Gas Fired Combined Cycle170.0March 2011
CT4Natural Gas Fired Combined Cycle170.0March 2011
ST1Natural Gas Fired Combined Cycle300.0February 2006
ST2Natural Gas Fired Combined Cycle300.0March 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Jack County Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Jack County and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Jack County

Questions about Jack County

How much power does Jack County produce?

Jack County reported 6,251,601 MWh (6.25 TWh) of net generation in 2025, a 55.8% capacity factor on 1,280 MW of nameplate capacity. From January to July 2026 it reported 1.42 TWh, which is provisional.

Where is Jack County?

Jack County is in Wise County, Texas, at 33.1010, −97.9574. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Jack County?

EIA-860M for August 2026 lists Jack County Power, LLC as the operator (EIA operator ID 66085). The operator is not always the owner.

When did Jack County start operating?

Its first generator began operating in February 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page