WindOperatingERCOT

Keechi Wind

Wind power plant in Jack County, Texas. 110 MW of nameplate capacity across 1 generator, operated by Keechi Wind, LLC.

Also known as Keechi · EIA plant 58838

Analyst: free account, 1 question a day.

Barton Chapel Wind FarmJack CountySenate Wind LLCBridgeport Gas Processing PlantKeechi Wind10 km
Open in the map
6 plants within 34 km, from EIA coordinates.

Key facts

Capacity
110 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2015First generator online
Operator
Keechi Wind, LLCEIA operator ID 62969
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Jack County, TX33.1431, −98.1611
EIA plant ID
58838EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Keechi Wind produces

Free · EIA-923

Net generation, 2025

391 GWh

390,565 MWh, final

Capacity factor, 2025

40.5%

2024: 40.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

390.6–437.7

GWh a year. Low 2025, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015401,536Not reported12 of 12
2016426,12244.1%12 of 12
2017432,81044.9%12 of 12
2018425,49944.2%12 of 12
2019437,66045.4%12 of 12
2020431,09144.6%12 of 12
2021406,37142.2%12 of 12
2022421,60443.8%12 of 12
2023411,85242.7%12 of 12
2024394,86340.9%12 of 12
2025390,56540.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
KW1Onshore Wind Turbine110.0January 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Keechi Wind, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Keechi Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Keechi Wind

Questions about Keechi Wind

How much power does Keechi Wind produce?

Keechi Wind reported 390,565 MWh (391 GWh) of net generation in 2025, a 40.5% capacity factor on 110 MW of nameplate capacity.

Where is Keechi Wind?

Keechi Wind is in Jack County, Texas, at 33.1431, −98.1611. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Keechi Wind?

EIA-860M for August 2026 lists Keechi Wind, LLC as the operator (EIA operator ID 62969). The operator is not always the owner.

When did Keechi Wind start operating?

Its first generator began operating in January 2015, according to EIA-860M.

Does InfraMap have power prices for Keechi Wind?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Keechi Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page