Gregory Power Plant

Natural gas power plant in San Patricio County, Texas. 469.8 MW of nameplate capacity across 3 generators, operated by Gregory Power Partners LLC.

Also known as Gregory Cogeneration Plant · EIA plant 55086

Analyst: free account, 1 question a day.

Ingleside CogenerationRegis GregoryMidway Wind, LLCPapalote Creek II LLCNueces BayGregory10 km
Open in the map
6 plants within 18 km, from EIA coordinates.

Key facts

Capacity
469.8 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 2000First generator online
Operator
Gregory Power Partners LLCEIA operator ID 7667
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
San Patricio County, TX27.8893, −97.2584
EIA plant ID
55086EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gregory produces

Free · EIA-923

Net generation, 2025

640 GWh

639,865 MWh, final

Capacity factor, 2025

15.5%

2024: Not reported

January to July 2026

241 GWh

Provisional

Range, 2015 to 2025

−0.0–2.7

TWh a year. Low 2018, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,525,315Not reported12 of 12
20013,171,824Not reported12 of 12
20022,891,620Not reported12 of 12
20032,739,340Not reported12 of 12
20042,793,070Not reported12 of 12
20052,671,097Not reported12 of 12
20062,706,019Not reported12 of 12
20072,815,988Not reported12 of 12
20082,914,287Not reported12 of 12
20092,743,297Not reported12 of 12
20102,729,69672.1%12 of 12
20112,671,58170.6%12 of 12
20122,748,26272.4%12 of 12
20132,664,620Not reported12 of 12
20142,415,80763.8%12 of 12
20152,663,02270.4%12 of 12
20162,105,74355.5%12 of 12
2017−5,627-0.1%12 of 12
2018−6,353-0.2%12 of 12
2019367,2539.7%12 of 12
2020517,65913.6%12 of 12
2021725,76219.2%12 of 12
2022699,28718.5%12 of 12
2023480,58412.7%12 of 12
2024841,063Not reported12 of 12
2025639,86515.5%12 of 12
2026 (provisional, partial year)240,94310.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

328,484

US short tons. 2024: 449,177

SO₂, 2025

2

US short tons

NOx, 2025

91

US short tons

CO₂ per MWh, calculated

0.51 t

About 1,027 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (101, 102), matched to EIA plant 55086 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

272

million gallons

Consumption, 2024

162

million gallons

Source

San Patricio Municipality

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.210

USGS SUI, HUC12 Kinney Bayou-Frontal Corpus Christi Bay

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1ANatural Gas Fired Combined Cycle184.9July 2000
GT1BNatural Gas Fired Combined Cycle184.9July 2000
STGNatural Gas Fired Combined Cycle100.0July 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Gregory Power Partners LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gregory Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gregory

Questions about Gregory

How much power does Gregory Power Plant produce?

Gregory Power Plant reported 639,865 MWh (640 GWh) of net generation in 2025, a 15.5% capacity factor on 469.8 MW of nameplate capacity. From January to July 2026 it reported 241 GWh, which is provisional.

Where is Gregory Power Plant?

Gregory Power Plant is in San Patricio County, Texas, at 27.8893, −97.2584. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Gregory Power Plant?

EIA-860M for August 2026 lists Gregory Power Partners LLC as the operator (EIA operator ID 7667). The operator is not always the owner.

When did Gregory Power Plant start operating?

Its first generator began operating in July 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values