Natural gasOperatingERCOT

Ingleside Cogeneration

Natural gas power plant in San Patricio County, Texas. 517 MW of nameplate capacity across 3 generators, operated by Ingleside Cogeneration LP.

Also known as Ingleside Cogeneration Plant · EIA plant 55313

Analyst: free account, 1 question a day.

Gregory Power PlantRegis GregoryMidway Wind, LLCPapalote Creek II LLCNueces BayIngleside Cogeneration10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
517 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 1999First generator online
Operator
Ingleside Cogeneration LPEIA operator ID 26469
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
San Patricio County, TX27.8828, −97.2428
EIA plant ID
55313EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ingleside Cogeneration produces

Free · EIA-923

Net generation, 2025

2.87 TWh

2,868,461 MWh, final

Capacity factor, 2025

63.3%

2024: 58.8%

January to July 2026

1.77 TWh

Provisional

Range, 2015 to 2025

2.6–3.0

TWh a year. Low 2017, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,648,291Not reported12 of 12
20013,447,245Not reported12 of 12
20022,851,023Not reported12 of 12
20033,041,347Not reported12 of 12
20042,813,773Not reported12 of 12
20052,535,014Not reported12 of 12
20062,643,043Not reported12 of 12
20072,768,838Not reported12 of 12
20082,550,251Not reported12 of 12
20092,796,452Not reported12 of 12
20102,782,45157.9%12 of 12
20112,684,31655.9%12 of 12
20122,758,432Not reported12 of 12
20133,034,084Not reported12 of 12
20142,044,21467.2%8 of 12
20152,962,29865.4%12 of 12
20163,007,85066.2%12 of 12
20172,552,53656.4%12 of 12
20182,596,042Not reported12 of 12
20192,995,97666.2%12 of 12
20202,955,68665.1%12 of 12
20212,655,46858.6%12 of 12
20222,856,321Not reported12 of 12
20232,736,67760.4%12 of 12
20242,672,33958.8%12 of 12
20252,868,46163.3%12 of 12
2026 (provisional, partial year)1,768,31167.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

622

million gallons

Source

San Patricio Municipal Water

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.210

USGS SUI, HUC12 Kinney Bayou-Frontal Corpus Christi Bay

0 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle170.1July 1999
CTG2Natural Gas Fired Combined Cycle170.1July 1999
STGNatural Gas Fired Combined Cycle176.8July 1999

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Ingleside Cogeneration LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ingleside Cogeneration and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ingleside Cogeneration

Questions about Ingleside Cogeneration

How much power does Ingleside Cogeneration produce?

Ingleside Cogeneration reported 2,868,461 MWh (2.87 TWh) of net generation in 2025, a 63.3% capacity factor on 517 MW of nameplate capacity. From January to July 2026 it reported 1.77 TWh, which is provisional.

Where is Ingleside Cogeneration?

Ingleside Cogeneration is in San Patricio County, Texas, at 27.8828, −97.2428. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Ingleside Cogeneration?

EIA-860M for August 2026 lists Ingleside Cogeneration LP as the operator (EIA operator ID 26469). The operator is not always the owner.

When did Ingleside Cogeneration start operating?

Its first generator began operating in July 1999, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page