Woodstock Windfarm

Wind power plant in Pipestone County, Minnesota. 9.2 MW of nameplate capacity across 1 generator, operated by RWE Clean Energy.

Also known as Woodstock Hills Wind Farm · Woodstock Hills Repower · EIA plant 55342

Analyst: free account, 1 question a day.

RidgewindNorthern WindKas Brothers WindfarmWindcurrent Farms LLCRock Aetna Power PartnersK-Brink Windfarm LLCWoodstock Windfarm2 km
Open in the map
6 plants within 4.9 km, from EIA coordinates.

Key facts

Capacity
9.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 1999First generator online
Operator
RWE Clean EnergyEIA operator ID 67192
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Pipestone County, MN43.9858, −96.0786
EIA plant ID
55342EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Woodstock Windfarm produces

Free · EIA-923

Net generation, 2025

37.1 GWh

37,087 MWh, final

Capacity factor, 2025

46.0%

2024: 35.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

6.8–41.8

GWh a year. Low 2018, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200126,877Not reported12 of 12
200228,332Not reported12 of 12
200326,702Not reported12 of 12
200425,984Not reported12 of 12
200524,921Not reported12 of 12
200625,896Not reported12 of 12
200726,986Not reported12 of 12
200825,582Not reported12 of 12
200921,524Not reported12 of 12
201019,49521.8%12 of 12
201121,95124.6%12 of 12
201222,83925.5%12 of 12
201321,56724.1%12 of 12
201422,90725.6%12 of 12
201510,91512.2%12 of 12
201617,14719.1%12 of 12
201712,92014.5%12 of 12
20186,8487.7%12 of 12
201911,360Not reported12 of 12
202032,25939.9%12 of 12
202133,98342.2%12 of 12
202241,79751.9%12 of 12
202334,93943.4%12 of 12
202428,49435.3%12 of 12
202537,08746.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WINDOnshore Wind Turbine9.2May 1999

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RWE Clean Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Woodstock Windfarm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Woodstock Windfarm

More plants operated by RWE Clean Energy

Questions about Woodstock Windfarm

How much power does Woodstock Windfarm produce?

Woodstock Windfarm reported 37,087 MWh (37.1 GWh) of net generation in 2025, a 46.0% capacity factor on 9.2 MW of nameplate capacity.

Where is Woodstock Windfarm?

Woodstock Windfarm is in Pipestone County, Minnesota, at 43.9858, −96.0786. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Woodstock Windfarm?

EIA-860M for August 2026 lists RWE Clean Energy as the operator (EIA operator ID 67192). The operator is not always the owner.

When did Woodstock Windfarm start operating?

Its first generator began operating in May 1999, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page