Natural gasOperatingCAISO

Otay Mesa Generating Project

Natural gas power plant in San Diego County, California. 710.7 MW of nameplate capacity across 3 generators, operated by Otay Mesa Energy Center LLC.

Also known as Otay Mesa Energy Center · EIA plant 55345

Analyst: free account, 1 question a day.

Pio Pico Energy CenterSan Diego - EMDF at San DiegoGateway Energy Storage SystemAmazon - SAN5Otay Mesa Generating Project1 km
Open in the map
5 plants within 1.7 km, from EIA coordinates.

Key facts

Capacity
710.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 2009First generator online
Operator
Otay Mesa Energy Center LLCEIA operator ID 14274
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Diego County, CA32.5815, −116.9150
EIA plant ID
55345EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Otay Mesa Generating Project produces

Free · EIA-923

Net generation, 2025

1.63 TWh

1,629,902 MWh, final

Capacity factor, 2025

26.2%

2024: Not reported

January to July 2026

469 GWh

Provisional

Range, 2015 to 2025

0.5–3.6

TWh a year. Low 2018, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009791,646Not reported3 of 12
20102,161,88335.8%12 of 12
20112,061,93434.2%12 of 12
20123,663,75360.6%12 of 12
20133,702,471Not reported12 of 12
20143,650,65460.5%12 of 12
20153,602,98559.7%12 of 12
20162,654,18243.9%12 of 12
20172,151,69735.7%12 of 12
2018493,1518.2%12 of 12
2019751,80312.5%12 of 12
20202,107,68434.9%12 of 12
20212,127,01635.3%12 of 12
20222,589,03042.9%12 of 12
20232,179,14536.1%12 of 12
20242,349,626Not reported12 of 12
20251,629,90226.2%12 of 12
2026 (provisional, partial year)468,76013.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

695,086

US short tons. 2024: 997,909

SO₂, 2025

4

US short tons

NOx, 2025

43

US short tons

CO₂ per MWh, calculated

0.43 t

About 853 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CTG-1, CTG-2), matched to EIA plant 55345 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

Low · 0.316

USGS SUI, HUC12 Poggi Canyon-Otay River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1-01Natural Gas Fired Combined Cycle210.0October 2009
1-02Natural Gas Fired Combined Cycle210.0October 2009
1-03Natural Gas Fired Combined Cycle290.7October 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Otay Mesa Energy Center LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Otay Mesa Generating Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Otay Mesa Generating Project

Questions about Otay Mesa Generating Project

How much power does Otay Mesa Generating Project produce?

Otay Mesa Generating Project reported 1,629,902 MWh (1.63 TWh) of net generation in 2025, a 26.2% capacity factor on 710.7 MW of nameplate capacity. From January to July 2026 it reported 469 GWh, which is provisional.

Where is Otay Mesa Generating Project?

Otay Mesa Generating Project is in San Diego County, California, at 32.5815, −116.9150. It is in the California Independent System Operator balancing area (CISO).

Who operates Otay Mesa Generating Project?

EIA-860M for August 2026 lists Otay Mesa Energy Center LLC as the operator (EIA operator ID 14274). The operator is not always the owner.

When did Otay Mesa Generating Project start operating?

Its first generator began operating in October 2009, according to EIA-860M.

Does InfraMap have power prices for Otay Mesa Generating Project?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Otay Mesa Generating Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page