Natural gasOperatingTVA

Magnolia Power Plant

Natural gas power plant in Benton County, Mississippi. 1,003.5 MW of nameplate capacity across 6 generators, operated by Tennessee Valley Authority.

Also known as EIA plant 55451

Analyst: free account, 1 question a day.

WildberrySr Byhalia, LLCSomerville SolarSR Canadaville, LLCYum Yum Solar LLCSR West Marshall, LLCMagnolia25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
1,003.5 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
August 2003First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Benton County, MS34.8350, −89.2026
EIA plant ID
55451EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Magnolia produces

Free · EIA-923

Net generation, 2025

6.66 TWh

6,662,322 MWh, final

Capacity factor, 2025

75.8%

2024: 76.1%

January to July 2026

3.62 TWh

Provisional

Range, 2015 to 2025

3.8–6.7

TWh a year. Low 2019, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
200384,858Not reported6 of 12
2004475,826Not reported12 of 12
20051,455,846Not reported12 of 12
20061,189,838Not reported12 of 12
20072,299,564Not reported12 of 12
20081,041,520Not reported12 of 12
20091,017,378Not reported12 of 12
201012,0991.7%1 of 12
201100.0%1 of 12
20124,579,19151.9%12 of 12
20134,418,171Not reported12 of 12
20144,079,14346.4%12 of 12
20154,945,10556.3%12 of 12
20165,731,83865.0%12 of 12
20175,144,76758.5%12 of 12
20185,554,67063.2%12 of 12
20193,768,36742.9%12 of 12
20205,310,25460.2%12 of 12
20214,180,90947.6%12 of 12
20225,051,65057.5%12 of 12
20235,807,97066.1%12 of 12
20246,704,56276.1%12 of 12
20256,662,32275.8%12 of 12
2026 (provisional, partial year)3,618,69270.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.99M

US short tons. 2024: 3.00M

SO₂, 2025

15

US short tons

NOx, 2025

277

US short tons

CO₂ per MWh, calculated

0.45 t

About 896 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (CTG-1, CTG-2, CTG-3), matched to EIA plant 55451 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

2,008

million gallons

Consumption, 2024

1,728

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Low · 0.254

USGS SUI, HUC12 Little Snow Creek-Snow Creek

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle178.5August 2003
CTG2Natural Gas Fired Combined Cycle178.5August 2003
CTG3Natural Gas Fired Combined Cycle178.5August 2003
STG1Natural Gas Fired Combined Cycle156.0August 2003
STG2Natural Gas Fired Combined Cycle156.0August 2003
STG3Natural Gas Fired Combined Cycle156.0August 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Magnolia Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Magnolia

More plants operated by Tennessee Valley Authority

Questions about Magnolia

How much power does Magnolia Power Plant produce?

Magnolia Power Plant reported 6,662,322 MWh (6.66 TWh) of net generation in 2025, a 75.8% capacity factor on 1,003.5 MW of nameplate capacity. From January to July 2026 it reported 3.62 TWh, which is provisional.

Where is Magnolia Power Plant?

Magnolia Power Plant is in Benton County, Mississippi, at 34.8350, −89.2026. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Magnolia Power Plant?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did Magnolia Power Plant start operating?

Its first generator began operating in August 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page