Natural gasOperatingSPP

Harrison County Power Project

Natural gas power plant in Harrison County, Texas. 570 MW of nameplate capacity across 3 generators, operated by Northeast Texas Elec Coop, Inc.

Also known as EIA plant 55664

Analyst: free account, 1 question a day.

Knox LeeMartin LakeSnider IndustriesEastman Cogeneration FacilityOak Hill - Dry CreekTenaska Gateway Gener…Harrison County Power…20 km
Open in the map
6 plants within 45 km, from EIA coordinates.

Key facts

Capacity
570 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2003First generator online
Operator
Northeast Texas Elec Coop, IncEIA operator ID 13670
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Harrison County, TX32.3958, −94.4367
EIA plant ID
55664EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Harrison County Power Project produces

Free · EIA-923

Net generation, 2025

2.57 TWh

2,565,558 MWh, final

Capacity factor, 2025

51.4%

2024: 64.9%

January to July 2026

1.74 TWh

Provisional

Range, 2015 to 2025

1.6–3.2

TWh a year. Low 2015, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003942,646Not reported12 of 12
2004530,078Not reported12 of 12
200588,968Not reported12 of 12
20061,099,375Not reported12 of 12
20071,217,873Not reported12 of 12
2008851,655Not reported12 of 12
2009543,789Not reported12 of 12
20101,032,91420.7%12 of 12
2011819,79616.4%12 of 12
2012684,26413.7%12 of 12
2013624,742Not reported12 of 12
2014930,36218.6%12 of 12
20151,560,51931.3%12 of 12
20162,421,77048.4%12 of 12
20171,992,83839.9%12 of 12
20181,572,40531.5%12 of 12
20192,612,56252.3%12 of 12
20202,892,71057.8%12 of 12
20212,867,64257.4%12 of 12
20222,762,06755.3%12 of 12
20233,246,24265.0%12 of 12
20243,247,91964.9%12 of 12
20252,565,55851.4%12 of 12
2026 (provisional, partial year)1,738,74860.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

1.11M

US short tons. 2024: 1.39M

SO₂, 2025

6

US short tons

NOx, 2025

137

US short tons

CO₂ per MWh, calculated

0.43 t

About 863 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (GT-1, GT-2), matched to EIA plant 55664 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

932

million gallons

Consumption, 2024

733

million gallons

Source

City Of Longview

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Low · 0.227

USGS SUI, HUC12 Gandia Branch-Sabine River

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT-1Natural Gas Fired Combined Cycle170.0June 2003
GT-2Natural Gas Fired Combined Cycle170.0June 2003
ST-1Natural Gas Fired Combined Cycle230.0June 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Northeast Texas Elec Coop, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Harrison County Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Harrison County Power Project

Questions about Harrison County Power Project

How much power does Harrison County Power Project produce?

Harrison County Power Project reported 2,565,558 MWh (2.57 TWh) of net generation in 2025, a 51.4% capacity factor on 570 MW of nameplate capacity. From January to July 2026 it reported 1.74 TWh, which is provisional.

Where is Harrison County Power Project?

Harrison County Power Project is in Harrison County, Texas, at 32.3958, −94.4367. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Harrison County Power Project?

EIA-860M for August 2026 lists Northeast Texas Elec Coop, Inc as the operator (EIA operator ID 13670). The operator is not always the owner.

When did Harrison County Power Project start operating?

Its first generator began operating in June 2003, according to EIA-860M.

Does InfraMap have power prices for Harrison County Power Project?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Harrison County Power Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page