Natural gasOperatingERCOT

Tenaska Gateway Generating Station

Natural gas power plant in Rusk County, Texas. 939.6 MW of nameplate capacity across 4 generators, operated by Tenaska Gateway Partners Ltd.

Also known as EIA plant 55132

Analyst: free account, 1 question a day.

Oak Hill - Dry CreekMartin LakeNacogdoches PowerStryker CreekKnox LeeHarrison County Power…Tenaska Gateway25 km
Open in the map
6 plants within 45 km, from EIA coordinates.

Key facts

Capacity
939.6 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
Tenaska Gateway Partners LtdEIA operator ID 18518
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Rusk County, TX32.0178, −94.6197
EIA plant ID
55132EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tenaska Gateway produces

Free · EIA-923

Net generation, 2025

4.71 TWh

4,708,795 MWh, final

Capacity factor, 2025

57.2%

2024: 18.3%

January to July 2026

2.24 TWh

Provisional

Range, 2015 to 2025

1.5–4.7

TWh a year. Low 2024, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20011,509,848Not reported6 of 12
20024,426,124Not reported12 of 12
20034,333,939Not reported12 of 12
20043,822,987Not reported11 of 12
20053,999,299Not reported12 of 12
20064,139,359Not reported12 of 12
20073,899,278Not reported12 of 12
20081,778,316Not reported6 of 12
20092,503,818Not reported12 of 12
20103,098,78837.6%12 of 12
20113,256,36139.6%12 of 12
20124,128,10750.0%12 of 12
20134,295,855Not reported12 of 12
20142,923,15652.9%8 of 12
20154,030,18849.0%12 of 12
20163,771,31945.7%12 of 12
20172,530,60030.7%12 of 12
20182,905,42835.3%12 of 12
20193,903,75747.4%12 of 12
20204,095,57049.6%12 of 12
20213,267,07739.7%12 of 12
20223,950,40348.0%12 of 12
20233,089,89737.5%12 of 12
20241,512,90218.3%12 of 12
20254,708,79557.2%12 of 12
2026 (provisional, partial year)2,241,72446.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.02M

US short tons. 2024: 796,913

SO₂, 2025

10

US short tons

NOx, 2025

536

US short tons

CO₂ per MWh, calculated

0.43 t

About 856 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (OGTDB1, OGTDB2, OGTDB3), matched to EIA plant 55132 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

657

million gallons

Consumption, 2024

533

million gallons

Source

SABINE RIVER

Surface, Fresh. Induced-draft tower

Watershed stress

High · 0.648

USGS SUI, HUC12 Bearden Branch-Murvaul Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GTG1Natural Gas Fired Combined Cycle183.2July 2001
GTG2Natural Gas Fired Combined Cycle183.2July 2001
GTG3Natural Gas Fired Combined Cycle183.2July 2001
STG1Natural Gas Fired Combined Cycle390.0July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tenaska Gateway Partners Ltd as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tenaska Gateway Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tenaska Gateway

Questions about Tenaska Gateway

How much power does Tenaska Gateway Generating Station produce?

Tenaska Gateway Generating Station reported 4,708,795 MWh (4.71 TWh) of net generation in 2025, a 57.2% capacity factor on 939.6 MW of nameplate capacity. From January to July 2026 it reported 2.24 TWh, which is provisional.

Where is Tenaska Gateway Generating Station?

Tenaska Gateway Generating Station is in Rusk County, Texas, at 32.0178, −94.6197. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Tenaska Gateway Generating Station?

EIA-860M for August 2026 lists Tenaska Gateway Partners Ltd as the operator (EIA operator ID 18518). The operator is not always the owner.

When did Tenaska Gateway Generating Station start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page